| 1 | L1₹6.6 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹6.6 L+₹1,868.85 (0.28%)Rejected-Finance 15B 6TH STREET ALAGAMMAL NAGAR NERKUNDARAM CHENNAI 600 107 | CHENNAI | TAMIL NADU | 600107 | L2 | Rejected-Finance Highest |
Tender Value
₹8.7 L
EMD Value
₹8,710
Closing Date
24 May 2023, 3:00 pmClosed
Block Development Officer (BP)
Block Development Office, Pattukkottai
Thanjavur District Pattukkottai Block Nattuchalai Panchayat Renovation of School building under SIDS 2022 23 Package 11 Tender notice.
2023_RDTN_316216_1
5634/2022/A6
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Pattukkottai
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹8,710
Yes
25 May 2023
17 May 2023
24 May 2023
17 May 2023
24 May 2023
17 May 2023
Amount
Part 1 Renovation of at PUE school Building at Nattuchalai Habitation in Nattuchalai Panchayat (west facing ) .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling and removel of wooden windows including all chagres etc completed
Dismantling and removel of Brick work including all chagres etc completed
Dismantling One Course of Pressed Tile in cement mortar and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Repairs to Wooden Doors/ Windows including all labour charges etc., complete
Cost and Supply of New steel doors and windows including all labour charges etc., complete
Windows
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:3 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers - 30 % of New Tiles
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Painting over old wood works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Painting over New iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Teachers cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing of cuddappah slab 20/30 thick
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing cup board shutter frame using termite/water proof plywood of 19mm thick over which laminated of the shutter etc completed
Lunch box cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
chappal Rack
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with good quality M.sand including cost and conveyance of all materials and all labour charges for etc completed.
Filling of 40mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Filling of 20mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Cost and supply of RCC 900mm dia rings &cover including all charges etc
600mm dia RCC rings
600mm dia RCC cover
Supplying and fixing PVC Rainwater Down fall pipe of 110mm dia with necessary shoes bends & clamps etc
Electrification
Supply and fixing of single box type 4'40W LED Light fitting complete with PVC unsheathed copper leads from terminals to the fitting with tube
Plinth production
Earth wirk excavation and depositing on bank with in initial lead of 10m and initial life of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling in foundation. Basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered. Rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:4:8 (one cement, four crushed stone sand and eight hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for fondation including dewatering whereer necessary and laid in layers of not more than 15cm thick. Well rammed. consolidated and curing etc, complete complying with standared specification
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Part 2 Renovation of at PUE school Building at Nattuchalai Habitation in Nattuchalai Panchayat (North facing ) .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling One Course of Pressed Tile in cement mortar and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Repairs to Wooden Doors/ Windows including all labour charges etc., complete
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:3 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers - 30 % of New Tiles
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting over old wood works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Teachers cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing of cuddappah slab 20/30 thick
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing cup board shutter frame using termite/water proof plywood of 19mm thick over which laminated of the shutter etc completed
Lunch box cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
chappal Rack
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with good quality M.sand including cost and conveyance of all materials and all labour charges for etc completed.
Filling of 40mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Filling of 20mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Cost and supply of RCC 900mm dia rings &cover including all charges etc
600mm dia RCC rings
600mm dia RCC cover
Supplying and fixing PVC Rainwater Down fall pipe of 110mm dia with necessary shoes bends & clamps etc
Electrification
Supply and fixing of single box type 4'40W LED Light fitting complete with PVC unsheathed copper leads from terminals to the fitting with tube
15amps plug point SD15
16amps DPIC switch SD 142
Part 3 Renovation of at PUE school Girls Toilet at Nattuchalai Habitation in Nattuchalai Panchayat .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Plastering with Cement Mortar 1:3 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
White washing with best shell lime in two coats including all labour charges
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Part 4 Renovation of at PUE school boysToilet at Nattuchalai Habitation in Nattuchalai Panchayat .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Repairs to doors including all labour charges etc., complete
Steel door
Cost and Supply of New steel doors and windows including all labour charges etc., complete
New Door
White washing with best shell lime in two coats including all labour charges
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Painting over New iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Water Supply Works
20mm PVC pipe
20mm Tee
20mm Elbow
20mm coupler
20mm CP Tap
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S Kannan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .