Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.6 LAccepted-AOC | L1 | Accepted-AOC FIRST LOWEST TENDERER | |
| 2 | L2₹39.7 L+₹2.7 L (7.31%)Rejected-AOC NO 2B KANTHASAMY VATHIYAR STREET DHARMAPURI 636 701 | DHARMAPURI | TAMIL NADU | 636701 | L2 | Rejected-AOC SECOND LOWEST TENDERER | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance NEHRU NAGAR DHARMAPURI | DHARMAPURI | TAMIL NADU | 635106 | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance NULL | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | C.K.Saravanan L1 | SRI SELVA VINAYAKA BUILDING WORKS L2 |
|---|---|---|---|---|---|
| 1.00CIVIL WORK | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils and sub-soils and to full depth as may be directed except in hard rock requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150 mm layers well watered, rammed and consolidated including depositing surplus earth within the godown or inside compound in places shown with initial lead of 10 mts and initial lift of 2 mts. clearing, levelling the site, shoring, strutting, bailing of water wherever necessary etc., complete complying with standard specification and as directed. | 184 | M3 | 219 ₹40,296 Lowest | 255 ₹46,920 |
| 1.02 | CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 23 | M3 | 5,554 ₹1,27,742 Lowest | 5,750 ₹1,32,250 |
| 1.03 | Providing and laying in position, Standardised Concrete Mix M20 Grade in accordance with IS:456-200 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/M3 and mazimum water cement ratio of 0.55, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improvement workability without impairing strength and durability with about (5 Cu.m) 7730 Kg of 20mm machine crushed stone jelly and with about (3.3 Cum)5156 kg of 10-12mm machine crushed stone jelly and with about (4.7 Cum) 7670 kg of sand, but excluding cost of reinforcement gril and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, cutting etc., and Providing fixtures like fan clams in the RCC floor/ roof slabs wherever necessary without claiming extra etc., complete complying with standard specfication and as directed the departmental officers. The coarse and five aggregates to be used should comply with the requirements of 15 Standards. (No separate payment will be made by the Department for the excess usage of materials
In foundation and basement | 59 | M3 | 8,771 ₹5,17,489 Lowest | 8,950 ₹5,28,050 |
| 1.04 | In ground floor (Upto 4.50M height). | 24 | M3 | 8,902 ₹2,13,648 Lowest | 9,150 ₹2,19,600 |
| 1.05 | Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed.. | 75 | QTL | 8,988 ₹6,74,100 Lowest | 9,150 ₹6,86,250 |
| 1.06 | Providing FORM WORK for centering the soffits of all reinforcement concrete work including strutting to the required (3 metre) height with mild-steel sheets of size 90cmx60cm 10 gauge stiffened with welded mild steel angles of size 25mmx25mmx3mm laid with country wood joist of average of size 10cmx6.50cm at about 90cm centres with casurina props of 13cm dia at 75cm centre to centre with all nails coir, wedges complete and removing the form work after necessary curing period as directed by the corporations officers. The rates should inclusives of cutting , bending, welding , charges of M.S sheets, M.S. angles etc., Complete
For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams etc., | 320 | M2 | 932 ₹2,98,240 Lowest | 1,000 ₹3,20,000 |
| 1.07 | For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom | 286 | M2 | 1,140 ₹3,26,040 Lowest | 1,250 ₹3,57,500 |
| 1.08 | BRICK WORK in cement mortor 1:5(one cement, five sand) using best quality Country bricks of size 8" 3/4"x4 ¼ x 2 ¾ “ for walls including cost of scaffolding curing, finishing etc., complete complying with standard specification and as directed by the departmental officers.
In ground floor (Upto 4.50M height above basement). | 153 | M3 | 6,325 ₹9,67,725 Lowest | 6,575 ₹10,05,975 |
| 1.09 | PLASTERING with cement mortor 1:5 (one cement and three sand)12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed. | 1,616 | M2 | 274 ₹4,42,784 Lowest | 350 ₹5,65,600 |
Tender Value
Refer Docs
EMD Value
₹32,500
Closing Date
11 Jun 2025, 2:00 pmClosed
MANAGING DIRECTOR
Head Office at CMRL Administrative Building , Poonamallee High Road, Koyambedu, Chennai-107
Construction of Compound wall in TNCSC Godown Campus at Kuthapatti Village in Pennagaram Taluk in Dharmapuri District
2025_TCSC_560884_1
04/CED6/022729/2025
Open Tender
Civil Works
Lump-sum
90 days
Pennagaram
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹32,500
8 Sept 2025
23 May 2025
12 Jun 2025
23 May 2025
11 Jun 2025
23 May 2025
Amount
CIVIL WORK
Earth work excavation for foundation in all classes of soils and sub-soils and to full depth as may be directed except in hard rock requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150 mm layers well watered, rammed and consolidated including depositing surplus earth within the godown or inside compound in places shown with initial lead of 10 mts and initial lift of 2 mts. clearing, levelling the site, shoring, strutting, bailing of water wherever necessary etc., complete complying with standard specification and as directed.
CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing and laying in position, Standardised Concrete Mix M20 Grade in accordance with IS:456-200 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/M3 and mazimum water cement ratio of 0.55, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improvement workability without impairing strength and durability with about (5 Cu.m) 7730 Kg of 20mm machine crushed stone jelly and with about (3.3 Cum)5156 kg of 10-12mm machine crushed stone jelly and with about (4.7 Cum) 7670 kg of sand, but excluding cost of reinforcement gril and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, cutting etc., and Providing fixtures like fan clams in the RCC floor/ roof slabs wherever necessary without claiming extra etc., complete complying with standard specfication and as directed the departmental officers. The coarse and five aggregates to be used should comply with the requirements of 15 Standards. (No separate payment will be made by the Department for the excess usage of materials In foundation and basement
In ground floor (Upto 4.50M height).
Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed..
Providing FORM WORK for centering the soffits of all reinforcement concrete work including strutting to the required (3 metre) height with mild-steel sheets of size 90cmx60cm 10 gauge stiffened with welded mild steel angles of size 25mmx25mmx3mm laid with country wood joist of average of size 10cmx6.50cm at about 90cm centres with casurina props of 13cm dia at 75cm centre to centre with all nails coir, wedges complete and removing the form work after necessary curing period as directed by the corporations officers. The rates should inclusives of cutting , bending, welding , charges of M.S sheets, M.S. angles etc., Complete For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams etc.,
For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom
BRICK WORK in cement mortor 1:5(one cement, five sand) using best quality Country bricks of size 8" 3/4"x4 ¼ x 2 ¾ “ for walls including cost of scaffolding curing, finishing etc., complete complying with standard specification and as directed by the departmental officers. In ground floor (Upto 4.50M height above basement).
PLASTERING with cement mortor 1:5 (one cement and three sand)12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed.
COLOUR WASHING two coats over one coat of white washing using best shell lime including cost of gum, Kanjee , brushes colouring pigment approved by the officer and finishing complete complying with standard specification and as directed.
SRI SELVA VINAYAKA BUILDING WORKS (BID ID -1364219)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_669817.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .