| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 CrAccepted-AOC | ₹5.5 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹5.9 Cr+₹36.3 L (6.62%)Rejected-AOC 00 SHIVPURI BRIJRAJ NAGAR MARTHNA ETAWAH | ETAWAH | ETAWAH | UTTAR PRADESH | ₹5.9 Cr+₹36.3 L (6.62%) | 2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Similar works experience not enough , So Not Qualify with the eligibility criteria |
Tender Value
₹7.0 Cr
EMD Value
₹13.9 L
Closing Date
12 Feb 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER, IVth CIRCLE, I.W. JHANSI
OFFICE OF THE SUPERINTENDING ENGINEER IVth CIRCLE IRRIGATION WORKS, JHANSI
LOT- 05 Restoration work and demarcation of canal land from km 0.000 to 29.400 of Hadrukh Dy. in district Jalaun.
2024_UPIDC_883130_5
05/SE-IV/2023-24
Open Tender
Civil Works
Item Rate
270 days
JALAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹13.9 L
16 Mar 2024
2 Feb 2024
12 Feb 2024
2 Feb 2024
12 Feb 2024
2 Feb 2024
Amount
Repairing of Pacca Work
Dismentalling of old Brick work, P.C.C. including cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
Earth work in Mar, Ranker & Kankar mixed soil for excavation foundation i/c all cost of labour, materials and T&P etc.as direction fully satisfaction of engineer in charge.
C.C. 1:3:6 at bed level including cost of material, labour, T&P etc.as direction fully satisfaction of engineer in charge.
C.C. 1 : 2: 4 with Stone Grit (20-40 mm) size i/c all cost of labour, materials and T&P etc.as direction fully satisfaction of engineer in charge.
Brick work in 1:4 cement, mortar including all cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
Deep struck Pointing 1:2 Cement, Mortar including cost of material, labour and T&P etc.as direction fully satisfaction of engineer in charge.
C.C. 1 : 1.5: 3 with Stone Grit (10-20 mm) size i/c all cost of labour, materials and T&P etc.as direction fully satisfaction of engineer in charge.
Painting of Parapet as direction fully satisfaction of engineer in charge.
Boundry Pillar
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. as direction fully satisfaction of engineer in charge.
Centering and shuttering of RCC Precast boundry piller size 300x300x1650 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.as direction fully satisfaction of engineer in charge.
Supplying and placing of steel reinforcement including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.as direction fully satisfaction of engineer in charge.
Painting of RCC Precast boundry piller size 250x250x1650 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.as direction fully satisfaction of engineer in charge.
Outlet
Providing and Laying of 150 mm dia hume pipe including cost of labour materials T&P etc. as direction fully satisfaction of engineer in charge.
Lining
Earth work in Mar, Rankar and Kankar mixed soil in excavation of foundation of sleeper and lining in canal section. as direction fully satisfaction of engineer in charge.
C.C. in 1 : 2 : 4 in foundation of sleeper including all cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
Centering and shuttering for C.C.work. In sleeper including all cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
50 MM thick moorum sub grade 1:4 below C.C. lining with all cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
Preparering subgrade for C.C. lining, leveling, dressing and compaction with watering complete. as direction fully satisfaction of engineer in charge.
Supplying and laying two coats bitumin sealing compound on top of sleepers including all cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
Supplying / laying LDPE film 200 micron of Ist. Grade including all labour and T&P etc. as direction fully satisfaction of engineer in charge.
75 MM thick C.C. 1 : 2 : 4 in lining including laying, ramming and curing laid in alternate pannels i/c all cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
Filling 14x27 mm jointing C.C. lining with bitumen sealing compound i/c all cost of material, labour and T&P etc. as direction fully satisfaction of engineer in charge.
Restoration of Canal Section
Earth work in restoration of canal in Mar, Rankar & Kankar mixed Soil in filling including lead upto 595.0 m. and lift upto 1.5 m. with manual compaction and dressing etc. as direction fully satisfaction of engineer in charge.
Earth work in restoration of canal in Mar, Rankar & Kankar mixed Soil in Cutting including lead upto 30.0 m. and lift upto 1.5 m. with manual compaction and dressing etc. as direction fully satisfaction of engineer in charge.
M/S Yuraj construction
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .