Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H4₹1Rejected-Finance | ₹1 Quoted ₹0.10 | H4 | Rejected-Finance Not quoted H1 |
| 2 | H5₹1Rejected-Finance | ₹1 Quoted ₹0.01 | H5 | Rejected-Finance Not quoted H1 |
Tender Value
Refer Docs
EMD Value
₹4 Cr
Closing Date
25 Mar 2025, 5:00 pmClosed
CE(SO)
office of Chief Engineer (SO), Vidyut bhawan Shimla
Normal Banking of Power
2025_HPSEB_102211_1
IS-03/2025
Open Tender
Electrical Works
334 days
ALDC Shimla
As per NIT
17 documents required · 17 mandatory
₹1,475
Sr.AO Banking, HPSEBL
₹4 Cr
25 Jun 2025
18 Mar 2025
26 Mar 2025
18 Mar 2025
25 Mar 2025
19 Mar 2025
Supply of Banking of Power to Utility(s) / Trader(s) on RTC Basis (Time Slot - 00:00 Hrs to 24:00 Hrs) during the period 8th May, 2025 to 30th September, 2025 as per Table - 1 of Annexure- I of NIT documents
Supply of Banking of Power to Utility(s) / Trader(s) on RTC Basis (Time Slot - 00:00 Hrs to 24:00 Hrs) during the period 8th May, 2025 to 7th October, 2025 as per Table - 3 of Annexure- II of NIT documents
Supply of Day Power (Time Slot - 09:00 Hrs to 18:00 Hrs ) for Banking of Power to Utility(s) / Trader(s) during the period 8th June, 2025 to 7th October, 2025 as per Table - 5 of Annexure- III of NIT documents
Supply of Night Power (Time Slot - 00:00 Hrs to 06:00 Hrs & 22:00 Hrs to 24:00 Hrs) for Banking of Power to Utility(s) / Trader(s) during the period 16th June, 2025 to 15th September, 2025 as per Table - 7 of Annexure- IV of NIT documents
Arunachal Pradesh Power Corporation Private Limited
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid