Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹8.7 L+₹22,712.68 (2.69%)Accepted-Finance | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Sadha Construction L1 | V.S.A.Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Sand and silt Under water Earth work excavation and depositing on bank with initial lead of 10 m & initial lift of 2 m in Slush and Silt Under water upto 0.75 m depth requiring the aid basket and vessels etc,complete | 3,389.85 | M3 | 110.17 ₹3,73,459.77 Lowest | 115 ₹3,89,832.75 |
| 2.00 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 3,389.85 | Cum | 68 ₹2,30,509.8 Lowest | 70 ₹2,37,289.5 |
| 3.00 | Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc.,complete. | 128 | Hrs | 973 ₹1,24,544 Lowest | 980 ₹1,25,440 |
| 4.00 | Hire charges for deploying earth moving machinery poclain for earthwork including diesel, oil and labour charges etc.,complete. | 32 | Hrs | 2,544 ₹81,408 | 2,500 ₹80,000 Lowest |
| 5.00 | Hire Charges for Conveyence of excavated silt up to lead of 3km from the work site including loading, unloading, transporation charges and incidental charges by 3 unit capacity tipper lorry with driver and fuel charges for diesel and labour charges for dirver. | 36 | Trips | 938 ₹33,768 Lowest | 940 ₹33,840 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Jun 2026, 3:00 pmClosed
THE COMMISSIONER
AVADI CITY MUNICIPAL CORPORATION AVADI
Desilting of Existing Storm Water Drains in Ward No 31,33,40 and 41 of Zone-3 in Avadi City Municipal Corporation
2026_MAWS_681400_1
Roc No.3016/2026/E1-4
Open Tender
Civil Works
Fixed-rate
60 days
ZONE 3
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹10,000
29 Sept 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sand and silt Under water Earth work excavation and depositing on bank with initial lead of 10 m & initial lift of 2 m in Slush and Silt Under water upto 0.75 m depth requiring the aid basket and vessels etc,complete | 3,389.85 | M3 | - | - |
| 2 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 3,389.85 | Cum | - | - |
| 3 | Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc.,complete. | 128 | Hrs | - | - |
| 4 | Hire charges for deploying earth moving machinery poclain for earthwork including diesel, oil and labour charges etc.,complete. | 32 | Hrs | - | - |
| 5 | Hire Charges for Conveyence of excavated silt up to lead of 3km from the work site including loading, unloading, transporation charges and incidental charges by 3 unit capacity tipper lorry with driver and fuel charges for diesel and labour charges for dirver. | 36 | Trips | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_818897.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .