Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
3 Jan 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
SPECIAL REPAIR REPLACEMENT OF LIFTS (08 PASSENGER) OF KANYA AND MEENA BUILDING AGAINST BER AT NOFRA INCLUDING (3 YEARS) COMPREHENSIVE MAINTENANCE UNDER GE (NW) NOFRA COLABA MUMBAI
2021_MES_488111_1
8698/CWE(NW) MUMBAI/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE (NW) NOFRA
Refer NIT
7 documents required · 7 mandatory
₹2,000
Yes
GE (NW) NOFRA
₹1.8 L
Yes
23 Feb 2022
13 Nov 2021
5 Jan 2022
13 Nov 2021
3 Jan 2022
20 Dec 2021
13 Nov 2021 - 11 Dec 2021
Amount
Sch 'A' Part - I Dismantling of existing BER 08 Passenger lift to serve G+ 13 upper floor of any make complete with all accesories such as M/C (machine), Doors, Guide rails, CWT (counter weight), Car , Rope, Wiring and Control panel etc and old unserviceable lift all parts /accesories if required complete all as specified and directed by Engineer- in- charge. (Note : Meena, Kanya bldgs)
Material and labour for 20 mm thick mirror polished black granite slab, machine cut, mirror polished set on vertical surfaces 300 mm width allround with lift facial elevation including back casting CM (1:3) 15 mm thick and joint filling with white cement with pigment to match with shade of granite for lift archive at all floors as specified and directed by Engr-in-charge.
Material and labour for earthing complete with galvanized steel earth electrode 600x600x6mm thick burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below normal ground level connected to galvanized earth strip 32 x 6 mm by means of bolts, nuts & washers of galvanized iron or steel up to the test point all as shown in electrical plate No.3 of SSR Part-I connected to lifts including PCC chamber pit, CI cover, GI funnel with wire mesh, GI protection pipe of 50 mm dia for earth lead and 20mm GI pipe for watering , excavation and earth work in any type of soil, filling the pit with charcol and common salt surrounding the earth plate complete including connecting up to machine drive motor and control panel and testing on completion all as specified and directed by Engineer-in-Charge.
Supply and lay aluminium strip of size 32 x 6 mm from test point to lift machine room to be terminated to the control panel, machine and other equipment installed in machine room all as specified and directed by Engineer-in-Charge.
Taking down cement plaster, any description on brick or stone or cement concrete walls including raking out joints, hacking for key, scrubbing down with water at ht. upto 16th floor of bldg., complete all as specified and directed.
Taking down cement plaster, any description on brick or stone or cement concrete walls including raking out joints, hacking for key, scrubbing down with water at ht. G + 13) in lift shaft ,complete all as specified and directed.
Material and labour for rendering 15mm thick cement plaster in cement mortor 1:6 on brick or concrete surfaces, surfaces to be finished even and smooth without using extra cement & ht. upto 16th floor of bldg., complete all as specified and directed.
Material and labour for preparation of newly plastered surfaces of wall and applying two coats of oil bound distemper including primer complete all as specified and directed.
Material and labour for preparation of newly plastered surfaces of wall and applying two coats of white wash complete all as specified and directed.
Supply and fix MCCB 4 Pole 100Amp with 16A breaking capacity with thermal magnetic protection including sheet metal enclosures with locking arrangements etc suitable for 415 Volts complete all as specified and directed.
Design, supply,install, testing and comissioning of Passenger lift having capacity of 08 passenger (544Kg) , Speed 1.75 meter per second, with Gearless Machine, 415 Volts, 3 phase , AC 50 Hz supply, conforming to IS 14665, suitable to serve G+13 upper floors with AC variable voltage and variable frequency drive (VVVF Drive) complete with all standard accessories, simplex automatic and manual dual controlled operation, with/without attendant, center opening doors with door drive (Electric motor drive mechanism), sliding stainless steel doors. automatic rescue device (ARD) system, infra red door sensor in full height of door and built in announcing system without handset (03 Nos one each in car, machine room, and near ground floor landing) complete with the following specification and directed by Engineer-in-Charge . (Locations : Meena, Kanya lifts)
(i) Make & Type : Traction Gearless with Machine room (ii) Type of lift : Passenger lifts (iii) Load capacity : 544 Kg / 08Passenger including operator (iv) Speed : 1.75 Meter per second (v) Power supply : 415 Volts, 3 Phase AC ,50 Hz (vi) Type of drive : AC variable voltage & variable frequency (VVVF) (vii) Type of machine : Gearless permanent magnet synchronous motor ( including suitable capacity of electrical cabling FRLS with PVC conduits of suitable size and control & MCB) or as per existing or as per OEM. (viii) Car size (Inside) : Not less than 1.43 Sqm and alloweed tolerance as per IS: 16445 or as per existing or as per OEM recommendation. (ix) Shaft size : 2000 mm wide x 2000 mm depth (x) Car and landing doors : Telescopic opening , sliding type, stainless steel not less than 1.20mm thick having hair line finish for car and landing at all floor or as per existing or as per OEM recommendations. (xi) Car Enclosures : Standard manufacturing with MS Sheet Platform & Stainless steel, hairline finish paneling of 1.5 mm thick, with light fitting LED type of 05 watt -04 Nos, Cabin Fan 300mm sweep with auto start function ( incl wiring with suitable) stranded copper conductor cable FRLS), stainless steel false ceiling of 1.2 mm thick, mirror finish, stainless steel hand rail etc. (xii) Terminal buffers : Special spring buffers as per manufacturer's design. (xiii) Door opening : 800 mm wide x 2000 mm height clear opening (xiv) Car & CWT guide : Machined Tee for Car 89 x 62 x 16 mm & CWT 70 x 65 x 9 mm
(xv) Flooring : Vinyl tile (Standard pattern) as per existing cabin size (xvi) Signal System : Combined luminous hall push button with (LCD) TFT hall position indicators with stainless steel hairline face plate at all floors LED Car position indicator in car and over load warning in the car. Car operating panel with stainless steel hairline with etched borders and luminious button car dirrection indicator in car landing. Battery operated Alarm bell and Emergency light along with inverter of suitable capacity having power back up for a period of minimum 1/2 hour( 30 minutes). Fireman switch one no per lift to be installed at ground floor. All signal fixture and COP will have stainless steel face plate with hair line finish. 3D infra red sensor safety edge of door for entire height. Built in announcing system without hand set. (xvii) Car indicator : Shall be proivided with audio announcing system with music. (xviii) Stop and Opening : 14 Stops and 14 Openings all on the same side. (xix) Emergency services : Automatic Rescue Devices (ARD), to be operating with maintenace free batteries to bring the car to the nearest floor level and auto opening for evacuation of passengers in the event of power failure, b.Overload Relays, Contactor and Fuses, Electrical terminals of high quality, Limit switch with accessories on each floor, Gravity Counter weight as well as over hoisting/ over lowering limit switches for top most position and Phase sequence corrector, C .Fire emergency operation, d. Emergency operation for power failure, e. Earthquathquake emergency operation. (xx) System backup function : (a) Hall call mallfunction recovery system, (b) individual signal malfunction recovery system, (c) Group management control system, malfunction recovery system, (d) Individual control malfunction recovery system
Part-II Comprehensive maintenance and repair of fully automatic electrically operated, gearless with machine room, passenger lift with a carrying capacity of 08 Passenger (544 Kgs) to serve up to G+13 upper floors with speed of 1.75 mtr/Sec with single speed motor and AC single speed motor and AC variable voltage, variable frequency control, automatic levelling device to bring the lift car to exact landing level, simplex automatic operation with or without attendant including telescopic opening stainless steel sliding door and landing door shutters with stainless steel finish and indicators at each floor (02 lift) at NOFRA. Location : Meena Kanya
1st year after expiry of defect liability period
2nd year after expiry of defect liability period
3rd year after expiry of defect liability period
Note 12.00 to 12.03 :- Rates quoted under Sch A part-II shall be for both material and labour complete unless mentioned otherwise. After expiry of the defects liability period of 24 months from the certified date of completion of work, Government reserves the right to order the contractor to carryout comprehensive maintenance services of the lift (proveded by him under Sch A part II in accordane with terms and conditions detailed in Sch A and specifications enclosed theroff. in the event of Govt. exercising the above right, the terms of comprehensive maintenance service contract shall be for a period of three years. Total period of comprehensive maintenance service contract of thelift shall be three years from the expiry date of the details liability priod. The contractor shall enter in to a MOU with the OEMs for the provision of the lift and further maintenance. The MOU for the post waranty/post defect liability period between the contractor the contractor and OEM shall be submiotted at least six months prior to the issue of completion certificate of the main contract. The rate quoted under this Sch A part II shall be deemed to include for materials and labour required for comprehensive maintenance including repairs. The work covered under Sch A part II will be ordered on the contractor by the respective Garrison Engineer on every year through a separate works order for the lifts installed in their area the rate quoted by the contractor till completion of three years comprehensive maintenance. The rate quoted for replacement of all defective/ burnt spares of major/ minor materials included in this schedule. Also, this rate allotted for Material and labour for cleaning, greasing, overhauling, making Lift to smooth functioning etc without extra cost. This contract shall be opetative for the period of three years after expiry of defect liability period only for the purpose of comprehensive maintenance
Contractor shall carry out comprehensive maintenance (routine, daily, weekly, monthly, quarterly, half yearly, yearly) as per existing rules and regulation given by govt and department and maintain all the lifts in serviceable condition 24 hrs x 365 days without any extra cost during Defect Liablity Peiod of 24 months. Two mechanic shall be available round the clock at lift complaint cell for safe & smooth functioning of the lift. Rewinding of motor if required will be done by the contractor and no extra cost will be given by the department. The detailed lift mechanics of the firm shall report to the JE concerned at the Lift complaint cell for receiving complaints at round the clock daily including Sunday and Holiday. The detailed lift mechanics shall sign (their shift-wise) in the attendance register kept with lift cell. Bidders are to submit license from Govt of Maharashtra for maintenance & erection of lifts issued by Chief Electrical Inspector.
Escon Elevators Pvt Ltd
Bidder Name
Veer High Tech Solution
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .