Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-Finance | ₹13.0 L | L1 | Accepted-Finance ok |
| 2 | L2₹17.5 LAccepted-Finance GHAZIABAD 201206 U P INDIA MURADNAGAR GHAZIABAD UTTAR PRADESH 201206 UDYAM UP 29 0018296 09ATCPK8932G1ZH R M | GHAZIABAD | UTTAR PRADESH | 201206 | ₹17.5 L | L2 | Accepted-Finance ok |
| 3 | L3₹17.8 LAccepted-Finance 14A 2107 8 CHAH INDARA BHAGIRATH PALACE DELHI CENTRAL DELHI DELHI 110006 UDYAM DL 11 0029409 | NORTH DELHI | DELHI | 110006 | ₹17.8 L | L3 | Accepted-Finance ok |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to Non submission of EMD/FDR |
| 5 | Rejected-Technical | - | - | Rejected-Technical Due to Non submission of EMD/FDR |
| Sl No | Description | Qty | Unit | Avon Electricals L1 | AGNI AUTOMATION AND SECURITY L2 | Premier Engineering Company L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of LT-Indoor type TPN Bus Ductof rated current 4000 Amp Material of conductor Aluminium rated voltage-415 V AC +/-10% rectangular type of enclosure, with 90-degree bends as required, with inspection covers complete and with adaptor box.make-BCH | 7 | Mtrs | 4,83,000 ₹5.7 L | 6,23,000 ₹7.4 L | 11,90,000 ₹14.0 L |
| 2.00 | Dismantling of the existing bus duct for the transformer side as well as main LT Panel including cutting/disconnecting of the main bus bars and dismantling its joints with the panel and other works as required in shut down conditions for dismantling it from the site completely | 1 | Job | 33,480 ₹39,506.40 | 45,000 ₹53,100 | 25,000 ₹29,500 |
| 3.00 | Removing the old Bus Duct from the site and shifting of the new Bus Duct to the site including charges for shifting and charges for required Labour for job as per site requirement. | 1 | Job | 16,494 ₹19,462.92 | 21,500 ₹25,370 | 12,500 ₹14,750 |
| 4.00 | Installation of the new Bus duct at site for Providing power supply from the Transformer to the main LT Panel Incomer ACB along with carrying out all required works for fixing/ erection of the Bus Duct with providing all material/consumables as per site requirement. | 1 | Job | 1,22,881 ₹1.4 L | 1,15,000 ₹1.4 L | 1,25,000 ₹1.5 L |
| 5.00 | Making the required connections between the Newly installed bus duct and Transformer LT side by Providing and Fixing of the required Copper Flexible (Riveted Type) along with all required material and consumables for interconnection work as per site requirement. | 1 | Job | 1,77,966 ₹2.1 L | 1,97,900 ₹2.3 L | 45,000 ₹53,100 |
| 6.00 | Making the required connections between the Newly installed bus duct and LT Panels Incomer ACB side by Providing and Fixing of the required Copper Flexible (Riveted Type) along with all required material and consumables for interconnection work as per site requirement. | 1 | Job | 1,77,966 ₹2.1 L | 1,97,900 ₹2.3 L | 45,000 ₹53,100 |
| 7.00 | Supply and installation of Rubber Below at the Transformer end as well as LT Panel end including all the required work with Providing the required material and consumables for the Job. | 1 | Job | 12,610 ₹14,879.80 | 68,500 ₹80,830 | 25,000 ₹29,500 |
| 8.00 | Supply and Installation of Marshalling Box for space Heater for the Bus Duct along with supply and fixing of the Space Heater 240V, AC & Thermostat including, supply of sillica Gels required with all the required work with providing the required material and consumables for the job. | 1 | Job | 28,200 ₹33,276 | 1,46,500 ₹1.7 L | 22,500 ₹26,550 |
| 9.00 | Testing of the phase sequences, continuity etc. of the newlyconnected bus duct for making power supply arrangement for the incomer ACB of LT Panel as per site requirement. | 1 | Job | 20,800 ₹24,544 | 25,000 ₹29,500 | 15,000 ₹17,700 |
| 10.00 | Testing and commissioning of the Bus Duct and the incomer ACB for operations first at NO load and then at ON load as per the site requirement | 1 | Job | 26,890 ₹31,730.20 | 40,000 ₹47,200 | 7,500 ₹8,850 |
Tender Value
Refer Docs
EMD Value
₹42,500
Closing Date
28 Feb 2026, 2:30 pmClosed
Executive Engineer (EnM)HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Renovation of power supply system from Transformer no.2 to main LT panel and allied Works at Khyala Ph-I BPS.
2026_DJB_287473_6
NIT 14 (2025-26)/HP-I
Open Tender
Miscellaneous Works
30 days
EE(EnM)HP-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB
₹42,500
23 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
Supply of LT-Indoor type TPN Bus Ductof rated current 4000 Amp Material of conductor Aluminium rated voltage-415 V AC +/-10% rectangular type of enclosure, with 90-degree bends as required, with inspection covers complete and with adaptor box.make-BCH
Dismantling of the existing bus duct for the transformer side as well as main LT Panel including cutting/disconnecting of the main bus bars and dismantling its joints with the panel and other works as required in shut down conditions for dismantling it from the site completely
Removing the old Bus Duct from the site and shifting of the new Bus Duct to the site including charges for shifting and charges for required Labour for job as per site requirement.
Installation of the new Bus duct at site for Providing power supply from the Transformer to the main LT Panel Incomer ACB along with carrying out all required works for fixing/ erection of the Bus Duct with providing all material/consumables as per site requirement.
Making the required connections between the Newly installed bus duct and Transformer LT side by Providing and Fixing of the required Copper Flexible (Riveted Type) along with all required material and consumables for interconnection work as per site requirement.
Making the required connections between the Newly installed bus duct and LT Panels Incomer ACB side by Providing and Fixing of the required Copper Flexible (Riveted Type) along with all required material and consumables for interconnection work as per site requirement.
Supply and installation of Rubber Below at the Transformer end as well as LT Panel end including all the required work with Providing the required material and consumables for the Job.
Supply and Installation of Marshalling Box for space Heater for the Bus Duct along with supply and fixing of the Space Heater 240V, AC & Thermostat including, supply of sillica Gels required with all the required work with providing the required material and consumables for the job.
Testing of the phase sequences, continuity etc. of the newlyconnected bus duct for making power supply arrangement for the incomer ACB of LT Panel as per site requirement.
Testing and commissioning of the Bus Duct and the incomer ACB for operations first at NO load and then at ON load as per the site requirement
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_380895.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid