Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC Agreement made with L1 agency | |
| 2 | L2₹7.5 L+₹2.8 L (59.6%)Rejected-Finance | L2 | Rejected-Finance Not Approved |
Tender Value
Refer Docs
EMD Value
₹8,900
Closing Date
27 Feb 2021, 3:00 pmClosed
Executive Engineer
Office of Executive Engineer, W.S. Mech. Division, Rewari
Rewinding and commissioning of 02 No. 325 HP HT Crompton Greaves make motor Sr. No. 2161546/2 (P-18) and 2161546/5 (P-14) at Pump House JF-1
2021_HRY_160189_3
401/6-A dated 12.02.2021
Open Tender
Pumps/Motors
Works
90 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹8,900
24 Mar 2021
17 Feb 2021
1 Mar 2021
17 Feb 2021
27 Feb 2021
17 Feb 2021
Amount
Rewinding of 1 No. 325 HP HT CG Make motor Sr. No. 2161546/2 (P-18). Dismantling of Motor & taking out of all burnt strips from stator slots, after dismantling of connections, cleaning of slots, re-fixing/re-inserting of all new strips, reinsulated in stator slots, also providing and fixing of stator slots wedges, making brazing of strips and providing “F” class insulation & re-connection, providing coating with epoxy, drying out of stator, assembling of motor, testing of motor on no load and full load. ( including credit of copper scrap) .
Rewinding of 1 No. 325 HP HT CG Make motor Sr. No. 2161546/5 (P-14). Dismantling of Motor & taking out of all burnt strips from stator slots, after dismantling of connections, cleaning of slots, re-fixing/re-inserting of all new strips, reinsulated in stator slots, also providing and fixing of stator slots wedges, making brazing of strips and providing “F” class insulation & re-connection, providing coating with epoxy, drying out of stator, assembling of motor, testing of motor on no load and full load. ( including credit of copper scrap)
Terms & Conditions:- 1. The quoted rates shall be inclusive GST and all taxes as applicable. 2. The rates shall be for F.O.R. destination and inclusive of all incidental, carriage charges enroute & at destination and left over item, Nothing extra shall be payable separately. 3. Delivery & installation period :- 3 Months from the date of order to proceed with the work. 4. WWC@1% will be deducted from the each bill of the agency. 5. Warranty must be 18 Months or 2500 Operation Hours, whichever is earlier from the date of commissioning and acceptance thereof. 6. The goods which to be used must be conforming to IS Specification. 7. The successful bidder will have to inform the department after dismantling of stator before rewinding.
Prabhu Engg Works
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .