| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Below Tender |
| 2 | L2₹4.2 L+₹2,393.71 (0.58%)Rejected-AOC 9 56F SURVEY NO 1940 1C PERUNGUDI PART II VILLAGE KAVALKINARU PANCHAYAT RADHAPURAM TALUK TIRUNELVELI DIST | ₹4.2 L+₹2,393.71 (0.58%) | L2 | Rejected-AOC Above Tender |
| Sl No | Description | Qty | Unit | Rajan L2 | Jabarulla M L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for Open excavation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 4 | m3 | 182 ₹728 | 181.19 ₹724.76 Lowest |
| 2.00 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 2 | m3 | 363 ₹726 | 362.39 ₹724.78 Lowest |
| 3.00 | Cement concrete in 1:4:8 using 40 mm size ISS grade machine crushed chips including the cost of mixinglaying curing etc., complete complying with standard specification. | 5 | m3 | 7,800 ₹39,000 | 7,602.76 ₹38,013.8 Lowest |
| 4.00 | Supplying and erection of Steel Centering with strutting and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 7 | m2 | 437 ₹3,059 | 436.63 ₹3,056.41 Lowest |
| 5.00 | P.C.C.1:3:6 mix using 20 MM & 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 4 | m3 | 8,305 ₹33,220 | 8,304.71 ₹33,218.84 Lowest |
| 6.00 | Brick work in cm 1:5 mix using best country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 5 | m3 | 8,575 ₹42,875 | 8,572.64 ₹42,863.2 Lowest |
| 7.00 | Supplying and fabrication of steel and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 1,000 | kg | 104 ₹1,04,000 | 103.21 ₹1,03,210 Lowest |
| 8.00 | RCC 1:1.5:3 mix using 20mm ISS metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 7 | m3 | 12,100 ₹84,700 | 12,094.58 ₹84,662.06 Lowest |
| 9.00 | P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 3 | m3 | 8,976 ₹26,928 | 8,975.98 ₹26,927.94 Lowest |
| 10.00 | Plastering in cm 1:3 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 42 | m2 | 390 ₹16,380 | 389.61 ₹16,363.62 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
2 Apr 2025, 3:00 pmClosed
Executive Officer
Executive Officer Sholur Town Panchayat The Nilgiri District
Maintenance of GLR at Punithangar Opp Forest Office in Sholur Town Panchayat-15th FC Tied 2nd Instal 24-25
2025_DTP_535854_1
33/2025-1
Open Tender
Civil Works
Works
180 days
Sholur First Grade Town Panchayat
Others
2 documents required · 2 mandatory
₹0
₹5,000
Yes
5 Sept 2026
27 Mar 2025
2 Apr 2025
27 Mar 2025
2 Apr 2025
27 Mar 2025
27 Mar 2025 - 2 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_637755.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .