Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
27 Apr 2026, 5:00 pmClosed
Executive Engineer Jal Shakti Division Chamba
Executive Engineer Jal Shakti Division Chamba
Const. of of 1 No, Head Weir, Const. of 12 Nos Outlet chamber, Const. of Crate work , C/o Pucca main Channel 1370 Rmt, Const. of Retaining Wall, Const. of Anchor block 10 nos and Providing, Providing, laying, Jointing and testing of MSERW and HDP
2026_HPIPH_134570_1
EE-JSV-CBA-2026-982-1032 dated 18.04.2026
Open Tender
Civil Works - Water Works
Item Rate
540 days
Chamba
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
Executive Engineer Jal Shakti Division Chamba
₹2.4 L
4 May 2026
18 Apr 2026
28 Apr 2026
18 Apr 2026
27 Apr 2026
18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting in earth work in all kind of soil such as pick, jumper work blasting hard and soft rock chiseling soft or hard rock where blasting is prohibited and disposal of all ececavated earth work in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | |||||
| 2Excavation in drain and channel etc. in earth work including dressing of sides and bed and disposing of excavated earth upto a lead of 20 mtrs. And lift upto 1.5 mtrs. Disposesd earth to be leveled and neatly in (PJW).With in all leads and lifts as per the direction of the Engineer-in-charge. | |||||
| 3Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited including dewatering in saturated soil and stacking the excavated earth/metarials upto all leads and lifts up to all lifts, not exceeding more than 3.0mtr. clear from the edge of excavation and then returning the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | |||||
| 4Dressing of Side Slopes and preparation of sub grade for lining work With in all leads and lifts as per the direction of the Engineer-in-charge. | |||||
| 5Providing and laying cement concrete 1:6:12(1: cement :6 sand :12 graded crushed stone aggregate of 40mm. Nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per direction of the Engineer-in-charge. | |||||
| 6Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal sixe) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts, as per direction and entire satisfaction of the Engineer-in-Charge. | |||||
| 7Providing and laying cement concrete 1:3:6(1: cement :3 sand :6 graded crushed stone agg. of 40mm. Nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per direction of the Engineer-in-charge. | |||||
| 8Providing and laying cement conctete 1:5:10 (1cement: 5sand: 10graded stone agg. 40mm nominal size) with 15% plum and curing complete excluding cost of form work in R/Wall/Brest walls the size of plum 150 to 300mm as per PWD specification. With in all leads and lifts as per the direction of the Engineer-in-charge. | |||||
| 9Providing and laying cement concrete 1:2:4(1: cement :2 sand :4 graded crushed stone agg. of 20mm. Nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per direction of the Engineer-in-charge. | |||||
| 9.1 | Foundation footing bases of column and the like mass concrete with in all leads and lifts as per direction of the Engineer-in-charge. | - | Per cum. | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.05 MB
form6.pdf
Tender Documents • 0.39 MB
BOQ_199160.xls
BOQ • 0.31 MB
condition.pdf
Additional Documents • 0.18 MB
FormEight.pdf
Tender Documents • 1.40 MB
LeadChart.pdf
Additional Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .