Loading…
Loading…
Tender Value
₹24.0 L
EMD Value
₹47,950
Closing Date
24 Aug 2026, 9:00 amDue today
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
A/R M/O to Non-residential building under Sub Division No-V Shimla-III. (SH- C/O cupboard, repair of sheet roofing, wall panelling, PVC flooring , laying of pavers and chequered tiles, repair of toilets etc. for 1 year
2026_PWD_141296_4
SD-III-2026-8330-46dt.12-8-26
Open Tender
Civil Works - Buildings
Percentage
365 days
Nigam Vihar Shimla
As per SBD
11 documents required · 11 mandatory
₹500
₹47,950
15 Aug 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 9.9 | Per cubic metre. | 975 | ₹9,652.5 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres
lead : | 8 | Each | 127 | ₹1,016 |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 138.58 | Per square metre. | 34 | ₹4,711.69 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 19.8 | Per cubic metre. | 5,508 | ₹1,09,058.4 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 4.74 | Per square metre. | 254 | ₹1,203.71 |
| 6 | Edges of slabs and breaks in floors and walls under 20cm wide including carriage of materials within all leads and lifts complete as per the direction of the Engineer-in-Charge | 9.76 | Per Running Metre | 119 | ₹1,161.44 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1.5:3 (1 cement :1.5 coarse sand) : 3graded stone aggregate 20 mm nominal size) | 0.36 | Per cubic metre. | 6,441 | ₹2,289.29 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars | 53.31 | Per/ Kilogramme | 81 | ₹4,318.41 |
| 9 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations cement mortar 1:4 (1 cement : 4 coarse sand) | 2.38 | Per square metre. | 890 | ₹2,118.2 |
| 10 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., 600 x 600mm | 33 | Per square metre. | 1,144 | ₹37,752 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_209763.xls
BOQ • 0.45 MB
SBD2397370.pdf
Tender Documents • 5.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].