Loading…
Loading…
Tender Value
₹3.7 L
EMD Value
₹7,393
Closing Date
9 Jun 2026, 3:00 pm4d left
Executive Engineer (CD-VII)
Civil Division VII IFCD Rohini Office Complex Sector 15 Rohini Delhi.
Construction of Water Tank (PIAYU) in Cremation Ground at village Singhu in Narela Assembly Constituency.
2026_IFC_292371_1
EE/CD-VII/NIT/2026-27/16
Open Tender
Civil Works
30 days
Civil Division VII IFCD Rohini Office Complex Sect
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹7,393
30 May 2026
30 May 2026
9 Jun 2026
30 May 2026
9 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All Kinds of soil. | 8 | Cubic Metre | 177.7 | ₹1,421.6 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc, in layers not exceeding 20cm. in depth; consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m | 8 | Cubic Metre | 134.3 | ₹1,074.4 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) . | 1 | Cubic Metre | 4,782.2 | ₹4,782.2 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | 3 | Cubic Metre | 6,637.37 | ₹19,912.11 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).. | 1 | Cubic Metre | 7,631 | ₹7,631 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately) - All works above plinth level upto floor V level | 4 | Cubic Metre | 7,816.55 | ₹31,266.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 9 | Square Metre | 207.1 | ₹1,863.9 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landing, balconies and access platform. | 7 | Square Metre | 450.95 | ₹3,156.65 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, brussumers and cantilevers. | 9 | Square Metre | 366.2 | ₹3,295.8 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, pier, abutments, posts and struts. | 8 | Square Metre | 499.6 | ₹3,996.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_388318.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid