Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹4.9 L+₹51,415.53 (11.8%)Rejected-Finance | L2 | Rejected-Finance Reject |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
22 Jul 2025, 3:00 pmClosed
Block Developement Officer VP
BDO Office S.S kulam
Construction of Drainage From Kowsalya House to OHT tank at Periyar colony H/o,Kondayampalayam Panchayat
2025_RDTN_581432_1
325/2025/B2
Open Tender
Civil Works
Works
180 days
Kondayampalayam
Construction of Drainage From Kowsalya House to OHT tank at Periyar colony H/o,Kondayampalayam Panchayat
4 documents required · 4 mandatory
₹0
₹4,500
Yes
29 Jul 2025
14 Jul 2025
22 Jul 2025
14 Jul 2025
22 Jul 2025
14 Jul 2025
Amount
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B.
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete..
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete.
Cement Concrete 1:3:6 (One cement, four sand and eight aggregates) using 20mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete..
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works complete complying with standard specification and as directed by the departmental officers etc complete
Plastering With Cement Mortor 1:5 Mix 20 mm thick in all Floors including curing etc Completed
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VRK Construction (BID ID -1407665)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .