Loading…
Loading…
Tender Value
₹4.5 L
EMD Value
₹45,446
Closing Date
19 Sept 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Improvement CC work on the lane from Famous Tailor to Sohan Lal house, at Benajhabar Bhatta under Ward-10, Zone-4.
2026_NNKAN_1183280_1
304/AA-4/26-27
Open Tender
Civil Works
Percentage
30 days
ward-10
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹45,446
7 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet).- | 207.75 | sqm | 67 | ₹13,919.25 |
| 2 | Class-150 brick work in 1:4 cement, c. sand in foundation and pilnth etc all complete. Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plllinth in. Cement mortar 1:4 (1 cement : 4 coarse sand)- | 14.81 | cum | 6,600 | ₹97,759.2 |
| 3 | construction of granular sub base (GSB) etc all comp. construction of granular sub base (GSB) etc all comp. | 16.56 | cum | 3,676 | ₹60,874.56 |
| 4 | Providing chemical hardner for hard surface etc all comp. Extra Providing chemical hardner for hard surface etc all comp | 207 | sqm | 96.25 | ₹19,923.75 |
| 5 | Concrete /R.C.C Work 1:1½:3 (1 Cement: 1½ coarse sand (zone-Ill) : 3 graded stone aggregate 20 mm nominal size) | 20.82 | cum | 7,160 | ₹1,49,035.4 |
| 6 | Raising manhole by dismantling & refixing of manhole cover & frame including dimantling C.C. and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work | 12 | each | 704 | ₹8,448 |
| 7 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work | 3 | each | 7,464 | ₹22,392 |
| 8 | Construction of gullypit 0.60x0.60x0.75 as per KNN design etc all work Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work | 2 | nos | 5,180 | ₹10,360 |
| 9 | Cortage of Earth or Malvaup to 3 KM including all completion of work Cortage of Earth or Malvaup to 3 KM including all completion of work | 20.7 | cum | 116.96 | ₹2,421.07 |
| 10 | Add 18 % G.S.T. | 1 | Tax | 69,323.98 | ₹69,323.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_2225294.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .