| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-Finance | ₹18.1 L | L1 | Accepted-Finance Less ER |
| 2 | Rejected-Technical | - | - | Rejected-Technical Above ER |
| Sl No | Description | Qty | Unit | N RAJENDIRAN L2 | N R PAVANKUMAR L1 |
|---|---|---|---|---|---|
| 1.00PROVIDING BT ROAD FROM VARSAKTHI NAGAR MAIN ROAD IN SIDTHARAJA KANDIGAI PANCHAYAT | |||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 58.59 | Cum | 150 ₹8,789 | 140 ₹8,203 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 191.06 | Cum | 3,500 ₹6.7 L | 3,315 ₹6.3 L |
| 4.00 | Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,273.75 | Cum | 85 ₹1.1 L | 84.25 ₹1.1 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,273.75 | Cum | 20 ₹25,475 | 19.4 ₹24,711 |
| 6.00 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 63.69 | Cum | 9,985 ₹6.4 L | 9,982 ₹6.4 L |
| 7.00 | Proving and laying premix carpet with seal type ‘A’ 20mm consolidate thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum. of 6.7 mm IRC size BHG metal with 9.80 Kg. of Bitumen for 10 Sqm. For seal coat including cost and convergence of all materials from approved quarry to work site and stacking them to departmental gauge for pre-measurement including cost of bulk bitumen which will be supplied departmentally at work site and the cost of which will be recovered at the rates as specified in the special conditions appended herewith and including convergence of bitumen to work spot handling labour charges for the Bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrows including labour charges for spreading the mix to grades, line & profiles & consolidation with power roller, rolling etc. including hire fuel charges and running charges for Mini Hot Mix Plant Power Roller and all other incidental charges, Tools and Plants employed and all incidental charges such as barricading providing danger lights etc. complete complying with standard specification. (Payment shall be made for finished item of work after completion.) | 1,273.75 | Cum | 290 ₹3.7 L | 284.5 ₹3.6 L |
| 8.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 29.3 | Cum | 1,165 ₹34,135 | 1,159 ₹33,959 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,735.1 ₹2,735.10 | 2,697.15 ₹2,697.15 |
Tender Value
₹21.5 L
EMD Value
₹43,500
Closing Date
7 Jan 2026, 3:00 pmClosed
Block Developement Officer VP
Kottaikarai, Gummidipoondi
Providing BT Road Varasakthi Nagar In S.R Kandigai panchayat
2025_RDTN_637723_1
RC/440/2025/A6
Open Tender
Civil Works
90 days
Gummidipoondi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹43,500
Yes
6 Mar 2026
31 Dec 2025
7 Jan 2026
31 Dec 2025
7 Jan 2026
31 Dec 2025
PROVIDING BT ROAD FROM VARSAKTHI NAGAR MAIN ROAD IN SIDTHARAJA KANDIGAI PANCHAYAT
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Proving and laying premix carpet with seal type ‘A’ 20mm consolidate thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum. of 6.7 mm IRC size BHG metal with 9.80 Kg. of Bitumen for 10 Sqm. For seal coat including cost and convergence of all materials from approved quarry to work site and stacking them to departmental gauge for pre-measurement including cost of bulk bitumen which will be supplied departmentally at work site and the cost of which will be recovered at the rates as specified in the special conditions appended herewith and including convergence of bitumen to work spot handling labour charges for the Bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrows including labour charges for spreading the mix to grades, line & profiles & consolidation with power roller, rolling etc. including hire fuel charges and running charges for Mini Hot Mix Plant Power Roller and all other incidental charges, Tools and Plants employed and all incidental charges such as barricading providing danger lights etc. complete complying with standard specification. (Payment shall be made for finished item of work after completion.)
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_763212.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_763212.xls
BOQ • 0.25 MB
tenderdocument.pdf
Tender Documents • 0.62 MB