Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.5 LAccepted-AOC | ₹13.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹13.6 LRejected-AOC | ₹13.6 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M Rajendran L1 | J Elango L2 |
|---|---|---|---|---|---|
| 1.00Providing CC Drain to Veerapuram Anjaneyar Kovil Road in Morai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 135 | Cum | 131.8 ₹17,793 | 132 ₹17,820 |
| 3.00 | Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 19.5 | Cum | 1,872.3 ₹36,510 | 1,874 ₹36,543 |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 19.5 | Cum | 5,545.5 ₹1.1 L | 5,547 ₹1.1 L |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 49.5 | Cum | 6,854.5 ₹3.4 L | 6,856 ₹3.4 L |
| 6.00 | Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete. | 712.5 | Sqm | 136.7 ₹97,399 | 138 ₹98,325 |
| 7.00 | Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 112.5 | Sqm | 590 ₹66,375 | 592 ₹66,600 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 2.13 | MT | 91,969.8 ₹2.0 L | 91,971 ₹2.0 L |
| 9.00 | RCC 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 20.99 | Cum | 9,297 ₹2.0 L | 9,299 ₹2.0 L |
| 10.00 | Manhole Cover | 49 | Nos | 1,864 ₹91,336 | 1,866 ₹91,434 |
Tender Value
₹13.3 L
EMD Value
₹33,150
Closing Date
6 Feb 2026, 3:00 pmClosed
Block Development Officer
Block Development Office VKM at Ambathur
Providing CC Drain to Veerapuram Anjaneyar Kovil Road in Morai Panchayat
2026_RDTN_651417_1
MLACDS 2025 -26
Open Tender
Civil Works
90 days
Villivakkam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹33,150
Yes
27 Feb 2026
5 Feb 2026
6 Feb 2026
5 Feb 2026
6 Feb 2026
5 Feb 2026
Providing CC Drain to Veerapuram Anjaneyar Kovil Road in Morai Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete.
Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete.
Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
RCC 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Manhole Cover
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_781139.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
document.pdf
Tender Documents • 0.77 MB
BOQ_781139.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid