| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹2.9 L+₹2,493 (0.87%)Accepted-Finance | L2 | Accepted-Finance Qualified | |
| 3 | L3₹3.0 L+₹15,682 (5.46%)Accepted-Finance | L3 | Accepted-Finance Qualified | |
| 4 | L4₹3.2 L+₹29,862 (10.4%)Accepted-Finance | L4 | Accepted-Finance Qualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected due to non compliance of techinical specification |
| Sl No | Description | Qty | Unit | M/s NEW DAR ELECTRICALS L1 | FAYAZ AHMAD DAR L2 | MADINA ELECTRICALS/MECHANICALS L3 | M/S AKASH ELECTRICALS AND MECH L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation,testing & commissioning of 25 kVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate | 1 | No | 99,000 ₹99,000 | 1,09,500 ₹1,09,500 | 90,000 ₹90,000 Lowest | 1,07,000 ₹1,07,000 |
| 2.00 | Supply, Installation,testing & commissioning of 9 Mtr. Long Pole ( ST-410 SP33) | 3 | No | 21,300 ₹63,900 | 18,250 ₹54,750 | 17,000 ₹51,000 Lowest | 19,500 ₹58,500 |
| 3.00 | Supply, Installation,testing & commissioning of ST poles 8m long ST-410 SP -15 | 1 | No | 17,500 ₹17,500 | 14,350 ₹14,350 | 14,000 ₹14,000 | 12,000 ₹12,000 Lowest |
| 4.00 | Supply, Laying,testing, stringing, tensioning and binding of conductor 50 mm² ACSR Conductor (Rabbit) | 0.2 | Km | 49,000 ₹9,800 | 46,500 ₹9,300 Lowest | 60,000 ₹12,000 | 55,000 ₹11,000 |
| 5.00 | Supply, Installation,testing & commissioning of LT fuse set as per approved drawings & GTP | 1 | Set | 4,000 ₹4,000 | 3,750 ₹3,750 | 3,000 ₹3,000 Lowest | 4,500 ₹4,500 |
| 6.00 | Supply, Installation,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | Set | 2,900 ₹2,900 Lowest | 2,900 ₹2,900 Lowest | 5,000 ₹5,000 | 6,000 ₹6,000 |
| 7.00 | Supply, Installation,testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 9,000 ₹9,000 | 10,850 ₹10,850 | 8,000 ₹8,000 Lowest | 11,700 ₹11,700 |
| 8.00 | Supply, Installation,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 2,900 ₹2,900 Lowest | 3,850 ₹3,850 | 40,000 ₹40,000 | 5,000 ₹5,000 |
| 9.00 | Supply, Installation,testing & commissioning of 70 mm², Single Phase Cable,1.1K V Grade, XLPE Insulated Stranded Conductor FRLS type | 44 | Mtr | 150 ₹6,600 Lowest | 215 ₹9,460 | 250 ₹11,000 | 285 ₹12,540 |
| 10.00 | Providing and fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting | 3 | No | 250 ₹750 Lowest | 440 ₹1,320 | 500 ₹1,500 | 800 ₹2,400 |
Tender Value
₹3.4 L
EMD Value
₹6,880
Closing Date
13 Nov 2025, 11:00 amClosed
Ex Engineer ED Awantipora
ED Awantipora
Creation of 25 KVA transformer alongwith HT LT poles and wire at Token Karewa Banderpora
2025_PDD_293580_1
EDA 45 of 25-26 Dt. 29-10-25
Open Tender
Electrical Works
Turn-key
30 days
Awantipora
Please refer to SBD
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer, ED Awantipora
₹6,880
Yes
20 Nov 2025
29 Oct 2025
13 Nov 2025
29 Oct 2025
13 Nov 2025
30 Oct 2025
30 Oct 2025 - 30 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
3.33 MB
Document
1.99 MB
Tender Documents
Tender Documents • 3.32 MB
Other Document
Other Document • 1.97 MB
BOQ
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .