Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2080 CrAccepted-Finance | ₹2080 Cr | L1 | Accepted-Finance Please refer uploaded sheet |
| 2 | Not L1₹2142 CrRejected-Finance A 898 TAGORE NAGAR LUDHIANA 141001 PUNJAB | LUDHIANA | LUDHIANA | PUNJAB | 141001 | ₹2142 Cr | Not L1 | Rejected-Finance Please refer uploaded sheet |
| 3 | Not L1₹2195.0 CrRejected-Finance 19 PARKDRIVE MALIBU TOWN SECTOR 47 SOHNA ROAD GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | ₹2195.0 Cr | Not L1 | Rejected-Finance Please refer uploaded sheet |
| 4 | Not L1₹2196 CrRejected-Finance | ₹2196 Cr | Not L1 | Rejected-Finance Please refer uploaded sheet |
| 5 | Not L1₹2197 CrRejected-Finance | ₹2197 Cr | Not L1 | Rejected-Finance Please refer uploaded sheet |
| Sl No | Description | Qty | Unit | BRIJ GOPAL CONSTRUCTION CO. PVT. LTD. L5 | G R Infraprojects Limited L6 | GAWAR CONSTRUCTION LIMITED L3 | KNR CONSTRUCTIONS LIMITED L7 | PNC Infratech Limited L4 | Ceigall Infra Projects Private Limited L2 | LLC Volgadorstroy L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Development of Ujjain-Jaora Access Controlled Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length - 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode. | 1 | Nos | 21,97,00,00,000 ₹2197 Cr | 22,25,77,00,000 ₹2225.8 Cr | 21,94,99,20,000 ₹2195.0 Cr | 24,54,74,71,000 ₹2454.7 Cr | 21,96,00,00,000 ₹2196 Cr | 21,42,00,00,000 ₹2142 Cr | 20,80,00,00,000 ₹2080 Cr |
Tender Value
₹2418.5 Cr
EMD Value
₹24.2 Cr
Closing Date
26 Aug 2025, 3:30 pmClosed
Chief Engineer (Procurement)
MPRDC Bhopal
Development of Ujjain-Jaora Access Controlled Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length - 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode.
2025_MPRDC_432175_1
673
Open Tender
Civil Works - Highways
Ujjain
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹24.2 Cr
MPRDC Bhopal
12 Dec 2025
23 Jun 2025
28 Aug 2025
23 Jun 2025
26 Aug 2025
14 Jul 2025
4 Jul 2025
Amount
Development of Ujjain-Jaora Access Controlled Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length - 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode.
Ceigall Infra Projects Private Limited (BID ID -1318910)
GAWAR CONSTRUCTION LIMITED (BID ID -1326483)
PNC Infratech Limited (BID ID -1302398)
BRIJ GOPAL CONSTRUCTION CO. PVT. LTD. (BID ID -1298722)
G R Infraprojects Limited (BID ID -1302430)
KNR CONSTRUCTIONS LIMITED (BID ID -1319490)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid