Loading…
Loading…
Tender Value
₹12.7 L
EMD Value
₹25,500
Closing Date
8 Jul 2026, 3:00 pm3d left
Executive Engineers E(EnM)M-9
C-2A Block Opp. Geeta Mandir Janakpuri
Renovation of water delivery system at 570 BPS in Rajouri Garden, AC-27.
2026_DJB_294782_1
NIT No. 5 (2026-27)EE(EnM)M-9
Open Tender
Miscellaneous Works
30 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
DJB Account No. 50448339804
₹25,500
3 Jul 2026
3 Jul 2026
8 Jul 2026
3 Jul 2026
8 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Replacement of Pumpset by carrying out following works :-S/O horizontal split casing pump with impeller, Neck Ring and casing (CI), shaft & sleeve as per in standard fitted condition suitable for head 42 mtrs, discharge 180 m3/hr. Make: Kirloskar/ M&P/DJB approved make. | 2 | No | 80 | ₹160 |
| 2 | S/O IE2 Totally enclosed fan cooled squirrel cage flame proof Induction Motor of 40 HP, 1450 rpm, suitable for operation on 415+/-10% V, 3 phase, 50 Hz +/- 5% AC supply with ambient 45 to 50 degree Celsius ambient, Class F insulation with temperature rise limited to class B. Make :-Seimens/CG/KBL/DJB approved makes. | 2 | No | - | - |
| 3 | Supply of nuts bolts and washers as per site requirement. | 15 | kg | - | - |
| 4 | Supply of neoprene packing as per site requirement. | 25 | kg | - | - |
| 5 | Fabrication of MS Base Frame made from MS Chanel size 100mm x 50mm cross support and also fixing with MS vertical support U channel the foundation bolt to absorb the vibration and 4nos drilling as per existing site required. | 2 | Job | - | - |
| 6 | Providing & Fixing of foundation bolt.@ 4nos. as per site requirement. | 2 | Job | - | - |
| 7 | Fabrication of MS tapper of Suction and Delivery side with D/F for the Pumpsets as per site requirement. | 2 | Job | - | - |
| 8 | S/F pressure gauge along with gauge cock, copper/ G.I. tubing soldering etc as required. Make: Febig / HGuru. | 2 | Job | - | - |
| 9 | Making the foundation with the help of civil material of CC in ratio 1:2:4 with a one feet depth below the pump house surface level, Fixing of SS foundation bolts as in pocket by proper welding to MS jaal of RCC with proper support etc. @ 4nos. | 2 | Job | - | - |
| 10 | Fixing of MS Base frame made out of MS channel on the CC foundation and tightening the foundation nut and bolt. With the help of heavy manual labour and tripod with all tools and tackles required to complete the job. | 2 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_392022.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid