Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical 1 SANSKRUTI APPARTMENT MURKUTE LANE NEW PANDIT COLONY NASHIK TAL DIST NASHIL | NASHIK | NASHIK | MAHARASHTRA | 422001 | Accepted-Technical Accept |
| 3 | Accepted-Technical 17 RAM PLAZA NAVSHAKTI CHOWK BHABHA NAGAR NASHIK 422011 | NASHIK | NASHIK | MAHARASHTRA | 422011 | Accepted-Technical Accept |
Tender Value
₹50.1 Cr
Closing Date
27 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
VC and MD
8th Floor, World Trade Centre -1, Cuffee Parade, Mumbai-400005
SETTING UP OF AIR CARGO TERMINAL WITH APRON AND CONNECTING TAXIWAY AND OTHER INFRASTRUCTURES AT SHIRDI AIRPORT, KOPARGAON, KAKADI, MAHARASHTRA
2024_MADC_1001535_1
MADC/Shirdi Airport/2024/Cargo/
Open Tender
Civil Works
Item Rate
540 days
Shirdi Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
MADC office Mumbai
6 Mar 2024
9 Feb 2024
28 Feb 2024
9 Feb 2024
27 Feb 2024
16 Feb 2024
15 Feb 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (SH : 1.0 EARTHWORK) | - | - | - | - |
| - | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with in the site premises, as directed by engineer in charge . beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | - | Cubic Metre | - | - |
| - | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material with in the site premises, as directed by engineer in charge beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | - | Cubic Metre | - | - |
| - | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material with in the site premises, as directed by engineer in charge ,beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | - | Cubic Metre | - | - |
| - | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material with in the site premises, as directed by engineer in charge , beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | - | Cubic Metre | - | - |
| - | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material with in the site premises, as directed by engineer in charge , beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means | - | Cubic Metre | - | - |
| - | Excavation for foundation in Hard-rock by controlled blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres. from the building area including dewatering and back filling with available earth soil /murum watering, ramming etc. complete. (Lift upto 1.5m) By Mechanical Means | - | Cubic Metre | - | - |
| - | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. | - | Square Metre | - | - |
| - | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. | - | Square Metre | - | - |
| - | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. | - | Cubic Metre | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_1751039.xls
BOQ • 0.81 MB
139185571.pdf
Tender Documents • 0.13 MB
139185573.html
Tender Documents • 0.03 MB
3D_Rendered_Images.pdf
Tender Documents • 26.79 MB
dwg.pdf
Tender Documents • 25.29 MB
techspecs.pdf
Tender Documents • 8.29 MB
tender.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .