Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹92,700
Closing Date
5 Oct 2026, 11:00 am
EE MI FZD
suhag nagar fzd
Cunstruction of Anicut milik puliYA FZD
2026_UPMID_1184856_1
518/e tender/Anicut/2026/ milik puliya
Open Tender
Civil Works
Item Rate
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
Yes
Executive Engineer Minor Irrigation Fzd
₹92,700
Yes
suhag nagar fzd
5 Oct 2026
14 Sept 2026
5 Oct 2026
14 Sept 2026
5 Oct 2026
14 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK IN EXCAVATION IN WET SOIL IN FOUNDATION OF CREST, WING WALL, CUT OF WALL APRON,AND FLOOR IN UP AND DOWN STREAM WITH TWO LEAD AND LIFT OF UP TO GROUND HEIGHT FOR EVERY 0.30 M. LIFT OR PART THERE OF | 482.72 | M³ | - | - |
| 2 | PLAIN CEMENT CONCRETE IN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC.REQUIRED FOR PROPER COMPLETION OF THE WORK | 41.63 | M³ | - | - |
| 3 | RANDOM COURSE RUBBLE/ KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK SUB STRUCTURE | 32.33 | M³ | - | - |
| 4 | RANDOM COURSE RUBBLE/ KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK SUPER STRUCTURE | 24.82 | M³ | - | - |
| 5 | RENDUM RUBBLE BOULDER MASONARY IN SUPER STRUCURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH TO KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK SUB STRUCTURE | 3.25 | M³ | - | - |
| 6 | RENDUM RUBBLE BOULDER MASONARY IN SUPER STRUCURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH TO KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK SUPER STRUCTURE | 4.29 | M³ | - | - |
| 7 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND 20 MM STONE BALLAST OVER SURFACE OF FLOOR WING WALL AND CREST WALL INCLUDING COST OF MATERIAL ,LABOUR AND T&P ETC. | 11.61 | M³ | - | - |
| 8 | 15 MM THICK PLASTER IN 1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL,WING WALL,AND EXTENSION WALL INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC. | 21.2 | M² | - | - |
| 9 | RAISED /STRUCK POINTING WITH 1:2 CEMENT AND COURSE SAND MORTAR ON SURFACE OF WING WALL CREST WALL SLOPPY WALL ETC. INCLUDING SUPPLY OF ALL MATERIAL , LABOUR AND T&P | 45 | M² | - | - |
| 10 | DRY STONE PITCHING /FILLING IN LAUNCHING APRON INCLUDING SUPPLY OF MATERIAL ,LABOUR AND T&P | 8.37 | M³ | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.19 MB
BOQ_2229232.xls
BOQ • 0.29 MB
Document303.pdf
Tender Documents • 6.18 MB
corrigendum2.pdf
PDF • 0.71 MB
Document313.pdf
PDF • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .