Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹19.4 LAWARDED | ₹19.4 L | AWARDED |
Tender Value
₹27.9 L
EMD Value
₹50,000
Closing Date
30 Jun 2025, 9:30 pmClosed
Directorate of Municipal Administration
Annual Maintenance of RO Plant for the term 3 years after initial repairs of RO plants in City Corporation Belagavi Limits.
DMA/2025-26/OW/WORK_INDENT41043/CALL-2
DMA/2025-26/OW/WORK_INDENT41043/CALL-2
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Belagavi
₹700
₹50,000
21 Jun 2025
21 Jun 2025
26 Jun 2025
Annual Maintenance of RO Plant for the term 3 years after initial repairs of RO plants in City Corporation Belagavi Limits.
Dismantling of Cement Concrete Pavement - Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stoc...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting Each deposited layer by ramming after watering with a lea...
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/ Kankar/Moorum. (Tipper 10 m3)
Cost of Haulage Excluding Loading and Unloading - Case-1 : Surfaced Road - Taking output 10 t load and lead 10 km = 100 t.km
Providing and fixing brass full way valve gate with C.I. wheel of
approved quality (screwed end) : 32 mm nominal bore
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jo...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver - Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 ...
Operation & Maintenance for 3 Years - Viability Gap Funding (VGF ) = Total Cost (all costs including manpower, service & repairs, electricity etc) minus Revenue (user charges collected) as per detaile...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .