| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC COIMBATORE CORPORATION | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹10.9 L+₹1,638 (0.15%)Rejected-AOC COIMBATORE CORPORATION | COIMBATORE | TAMIL NADU | 638459 | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | P. K. SHANMUGAM L1 | GEETHAA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain including all labour charges etc complete. | 200 | m3 | 116 ₹23,200 Lowest | 120 ₹24,000 |
| 2.00 | Removal of cutstone slabs & RCC cover slabs including all labour and necessary tools as per the direction of departmental officers etc., | 51 | m2 | 620 ₹31,620 | 600 ₹30,600 Lowest |
| 3.00 | Refixing cut stone slab & RCC Cover slab including all labour and necessary tools as per the direction of departmental officers etc., | 51 | m2 | 680 ₹34,680 | 670 ₹34,170 Lowest |
| 4.00 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 155 | m3 | 220 ₹34,100 Lowest | 220 ₹34,100 Lowest |
| 5.00 | Conveyance the silt earth suitable for refilling,
dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 392 | m3 | 80 ₹31,360 Lowest | 100 ₹39,200 |
| 6.00 | Flooring with bed of cement concrete 1:4:8 (One part of cement, four parts of sand and eight parts of stone ‘elly by volume) using of 40 mm _ thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts
inside the building, | 23 | m3 | 6,000 ₹1,38,000 | 5,900 ₹1,35,700 Lowest |
| 7.00 | Supplying and erecting centering for sides and so including supports and strutting for plain surfaces such asreinforced cement concrete slabs, walls etc. with all cross bracing etc., including decentering after curing period,complete comply’ with standard specifications, at all leads inside the building, at all heights. | 290 | m2 | 550 ₹1,59,500 Lowest | 550 ₹1,59,500 Lowest |
| 8.00 | Side walls with Cement concrete 1:3:6 (One part of cement, three parts of sand and six parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to the specified 677 thickness including all labour charges for concreting, ramming, curing etc, complete complying
with relevant standard specifications | 60 | m3 | 6,950 ₹4,17,000 Lowest | 6,950 ₹4,17,000 Lowest |
| 9.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including 11 decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 31 | m2 | 1,180 ₹36,580 Lowest | 1,180 ₹36,580 Lowest |
| 10.00 | Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, ° 9” machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building. | 10 | m3 | 10,000 ₹1,00,000 | 9,800 ₹98,000 Lowest |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
23 Dec 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of storm water drain and culvert at Kumaran garden and desilting the existing storm water drain at various locations in ward no.89, south zone.
2025_MAWS_631281_35
e61/2025
Open Tender
Civil Works
Works
90 days
Coimbatore corporation
As per tender documents
5 documents required · 5 mandatory
₹0
₹13,000
26 Mar 2026
13 Dec 2025
24 Dec 2025
13 Dec 2025
23 Dec 2025
13 Dec 2025
Amount
Desilting the existing drain including all labour charges etc complete.
Removal of cutstone slabs & RCC cover slabs including all labour and necessary tools as per the direction of departmental officers etc.,
Refixing cut stone slab & RCC Cover slab including all labour and necessary tools as per the direction of departmental officers etc.,
Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting
Conveyance the silt earth suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.
Flooring with bed of cement concrete 1:4:8 (One part of cement, four parts of sand and eight parts of stone ‘elly by volume) using of 40 mm _ thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building,
Supplying and erecting centering for sides and so including supports and strutting for plain surfaces such asreinforced cement concrete slabs, walls etc. with all cross bracing etc., including decentering after curing period,complete comply’ with standard specifications, at all leads inside the building, at all heights.
Side walls with Cement concrete 1:3:6 (One part of cement, three parts of sand and six parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to the specified 677 thickness including all labour charges for concreting, ramming, curing etc, complete complying with relevant standard specifications
Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including 11 decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights.
Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, ° 9” machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building.
Plastering for concrete surfaces using cement mortar 1:5(One part of cement, five parts of sand by volume) thickness 12 mm (average) for all internal/external surfaces for drains etc., finished smoothly to one level including curing etc., complete, at all leads and at all heights.
Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning, cutting, ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts.
Supplying and fixing of 600 mm size heavy duty man hole cover and frame SFRC 1250 as per direction of the departmental officers
GEETHAA CONSTRUCTIONS (BID ID -1542781)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
ITB.pdf
Additional Documents • 0.20 MB
Building.pdf
Tender Documents • 0.99 MB
BOQ_756144.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .