| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC Low Rate | |
| 2 | L2₹4.3 L+₹15,016.43 (3.61%)Rejected-Finance | L2 | Rejected-Finance High Rate |
| Sl No | Description | Qty | Unit | P.THIRUMOORTHY L2 | V K PALANISAMY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all class of soils except hard rocks requiring blasting such as hard stift clay cotton hard earth shales murrams gravel stoney earth and earth mixed with small size with initial lead and lift including all incidential charges such as removing boulders sharing, strutting, watering bailing out water it necessary including all labour charges etc., Complete for foundation. Toilet | 75 | M3 | 255 ₹19,125 | 246.52 ₹18,489 Lowest |
| 2.00 | Plain Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 8 | M3 | 5,315 ₹42,520 | 5,274.39 ₹42,195.12 Lowest |
| 3.00 | Supplying , errecting and Centering for Side and Soffiots including necessary supports for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle of size 25x25x3mm for boarding laid over silver oak joists (Country wood) of size 10x6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 -13cm dia.spaced @ 75cm c/c etc., complete complying with standard specifications for Side wall etc., Complete.For Drain | 140 | M2 | 475 ₹66,500 | 459.89 ₹64,384.6 Lowest |
| 3.10 | For Septic tank | 14 | M2 | 1,115 ₹15,610 | 1,023.1 ₹14,323.4 Lowest |
| 4.00 | Supplying and Fabrication of Steel and placing in position MS / Ribbed tor steel grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc., Complete complying with standard specification in force per Kilogram. | 150 | Kg | 94 ₹14,100 | 89.88 ₹13,482 Lowest |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-25 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 350Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone sand (M- Sand) but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. | 2 | M3 | 8,125 ₹16,250 Lowest | 8,452.88 ₹16,905.76 |
| 6.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.(For 10 M3) | 8 | M3 | 7,415 ₹59,320 | 7,344.32 ₹58,754.56 Lowest |
| 7.00 | Plastering in C.M. 1 : 5 (one cement, five sand) to 12 mm thick including all cost and conveyance of all materials to site including cost of cement which will be purchared locally by the contractor and conveyance of the same to the actual work site and cost form work including watering curing and all leads of good potable water and all other. | 17 | M2 | 275 ₹4,675 | 269.37 ₹4,579.29 Lowest |
| 8.00 | Plastering in Cement Mortar 1:3 Mix (one Cement, Three M-sand ) 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 72 | M2 | 675 ₹48,600 | 566.15 ₹40,762.8 Lowest |
| 9.00 | Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specifications | 17 | M2 | 255 ₹4,335 | 249 ₹4,233 Lowest |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
11 Aug 2025, 3:00 pmClosed
Executive Officer
Kugalur Town Panchayat
Construction of Septic tank at Ward No03 Weekly Shandy and Construction of Storm water Drain at Ward no 4 13 Kugalur Main Road in Kugalur Town Panchayat- Erode District
2025_DTP_586561_1
211/2025-2026/2
Open Tender
Civil Works
Works
90 days
Kugalur Town Panchayat
2 documents required · 2 mandatory
₹0
₹10,000
Yes
18 Oct 2025
28 Jul 2025
12 Aug 2025
28 Jul 2025
11 Aug 2025
28 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .