Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.6 LAccepted-AOC NA | ₹38.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹38.6 L+₹3,090.03 (0.08%)Rejected-Finance | ₹38.6 L+₹3,090.03 (0.08%) | L2 | Rejected-Finance L2 |
| 3 | L3₹38.6 L+₹3,862.53 (0.10%)Rejected-Finance MISSION HOSPITAL KE PEECHE JAL NIGAM ROAD ROBERTSGANJ SONBHADRA | ₹38.6 L+₹3,862.53 (0.10%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE RED MZP
jhanvi hotel putlighar mirzapur
Nagar P CHURK GHURMA WARD NO. 05 ME PASU HOSPITAL KE JIRNODWAR KA NIRMAN KARYA
2026_REDUP_1123631_1
697/RED SBR/ 2025-26 DT- 30.01.2026
Open Tender
Civil Works
Percentage
90 days
CHURK
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,185
₹1 L
24 Jul 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually / mechanical means i/c stacking of serviceable mterial and disposal of unserviceable mterial within 50 meters lead s per direction of Engineer in charge as per DSR 15.7.4 | 7.77 | CUM | 1,467.75 | ₹11,404.42 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1 | 223.68 | Cum | 185.45 | ₹41,481.46 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per SI no. 4.1.8 | 34.83 | Cum | 4,853.07 | ₹1,69,032.43 |
| 4 | Coursed rubble massonary (second sort) with hard stone in foundation & plinth with : cement mortor 1:6 (1 cement:6 course sand) DSR 7.7.1 | 118.46 | Cum | 5,840.88 | ₹6,91,910.64 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Upto Plinth Lvl as SI No-5.1.2 | 37.84 | Cum | 6,444.45 | ₹2,43,857.99 |
| 6 | Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per SI No- 6.1.1 | 18.29 | cum | 5,251.06 | ₹96,041.89 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Upto Plinth Lvl as SI No-5.1.2 | 16.81 | Cum | 6,444.45 | ₹1,08,331.2 |
| 8 | Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22 B.1 | 44.67 | Qtl | 7,099.35 | ₹3,17,127.96 |
| 9 | Brick work with common burnt clay bricks of M-150 Class in super structure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:4 ( 1 cement : 4 coarse sand ) as per SI no 6.4.1 | 58.37 | cum | 6,657.19 | ₹3,88,580.18 |
| 10 | 12 mm thick cement plaster of mix 1:4 ( 1 cement & 4 course sand ) Outer Side as per IS 13.4.1 | 296.1 | Sqm | 254.59 | ₹75,384.1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 22.34 MB
BOQ_2093389.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .