Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹14.9 L+₹8,115.11 (0.55%)Rejected-AOC | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | R.Rajan L1 | M.Rajendran L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the light Jungle etc. complete as per direction of departmental officers | 1,350 | m2 | 7 ₹9,450 Lowest | 8 ₹10,800 |
| 2.00 | Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shabs murams and ordinary gravel and hard dravel including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as
directed by the departmental officers with initial lead and lift - 10 m | 23 | M3 | 220 ₹5,060 Lowest | 220 ₹5,060 Lowest |
| 3.00 | Conveyance of Surplus earth from work site to City outer with average lead of 2 km etc. complete as per direction of departmental officers | 19 | M3 | 103 ₹1,957 Lowest | 105 ₹1,995 |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 3.34 | M3 | 6,061 ₹20,243.74 Lowest | 6,070 ₹20,273.8 |
| 5.00Centering with Steel Plates including strutting,lining and levelling etc complete | |||||
| 5.01 | a)For Plinth Beams and footings sides | 353.35 | M2 | 1,067 ₹3,77,024.45 Lowest | 1,070 ₹3,78,084.5 |
| 5.02 | c)Beams | 158 | M2 | 1,180 ₹1,86,440 Lowest | 1,185 ₹1,87,230 |
| 6.00 | RCC 1:1.5:3 mix using 20mm HBG Jelly from approved quarry | 33 | M3 | 9,990 ₹3,29,670 Lowest | 9,995 ₹3,29,835 |
| 7.00 | Supply and fabrication of RTS rods in various dia including cutting and bending etc | 34 | Qtl | 6,126 ₹2,08,284 Lowest | 6,130 ₹2,08,420 |
| 8.00 | Refilling the excavated earth including watering and consolidation layer by layer with all incidental charges etc complete | 23 | m3 | 40 ₹920 Lowest | 45 ₹1,035 |
Tender Value
₹17.6 L
EMD Value
₹17,650
Closing Date
23 Sept 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Roof Slab For Drinking Water Sump at Kurichi Housing Unit Phase 1 Siruvani in ward No 97 South Zone Coimbatore Corporation.
2025_MAWS_604594_19
e46/2025
Open Tender
Civil Works
Works
120 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹17,650
7 Nov 2025
17 Sept 2025
24 Sept 2025
17 Sept 2025
23 Sept 2025
17 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .