Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.2 LAccepted-AOC NO 17 NEW CAUVERY NAGAR THANJAVUR 613 001 | THANJAVUR | TAMIL NADU | 613001 | ₹40.2 L | L1 | Accepted-AOC LER |
| 2 | L2₹45.9 LRejected-Finance | ₹45.9 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | SRI JAGATHI CONSTRUCTION L1 | M.Ramamoorthy L2 |
|---|---|---|---|---|---|
| 1.00Construction of Multi Purpose Waiting Hall in Mela Ulur Panchayat at Orathanadu Union. | |||||
| 2.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. | 125 | cum | 263 ₹32,875 | 280 ₹35,000 |
| 3.00 | Supplying and Filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 6.25 | cum | 2,303 ₹14,393.75 | 2,350 ₹14,687.50 |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 6.25 | cum | 6,218 ₹38,862.50 | 6,250 ₹39,062.50 |
| 5.00 | Supplying and Erecting Centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 49 | cum | 1,095 ₹53,655 | 1,100 ₹53,900 |
| 6.00 | Supplying, Fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.62 | cum | 91,924 ₹1.5 L | 91,950 ₹1.5 L |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 31.28 | sqm | 9,398 ₹2.9 L | 9,400 ₹2.9 L |
| 8.00 | BASE PLATE (16mm Thk.), STIFFENER PLATE-1,2,3,4 (8mm Thk.), LATTICE COLUMN 2 X ISMC 250, BATTENED PLATE @ 850 C/C, TIE BEAM @ 2 Lvls - SHS 100X100X4.0, PAD PLATE, CONNECTION PLATE-1,2, TUBE END COVER PLATE, ROOF TRUSS TOP CHORD 122X61X3.6_RHS, ROOF TRUSS VER. BRACINGS 50X50X3.2, ROOF TRUSS INCLINED BRACINGS 50X50X3.2_SHS, ROOF PURLIN Z 200x60x20x2.55, PURLIN CLEAT , SIDE RUNNER Z 200x60x20x2.55, CLEAT STIFFENER , SAG ROD 12mm DIA | 12,200 | sqm | 113.89 ₹13.9 L | 150 ₹18.3 L |
| 9.00 | Rates of other Construction Materials (Unique code : M0352, Page No : 81, Rs. 101.60 / eac | 440 | MT | 122 ₹53,680 | 150 ₹66,000 |
| 10.00 | Rates of other Construction Materials (Unique code : M0351, Page No : 81, 200mm long and 16mm dia Rs. 122.50 / each ) | 150 | cum | 122 ₹18,300 | 150 ₹22,500 |
Tender Value
₹42.4 L
EMD Value
₹42,420
Closing Date
17 Oct 2025, 3:00 pmClosed
Block Development officer(BP), Orathanadu,Thanjavu
Block Development officer(BP), Orathanadu,Thanjavu
Thanjavur District Orathanadu block Construction of Shed to Multipurpose Hall at Melaulur Panchayat in Orathanadu Block of Thanjavur district Under MPLADS 2025-26 Tranche.
2025_RDTN_614093_1
Rc.No.1159/2025/A3 dated.10.10.2025
Open Tender
Civil Works - Buildings
120 days
Orathanadu
As per Tender document
9 documents required · 9 mandatory
₹0
₹42,420
14 Mar 2026
14 Oct 2025
17 Oct 2025
14 Oct 2025
17 Oct 2025
14 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid