| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹5.5 L+₹60,950 (12.6%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹5.8 L+₹91,700 (18.9%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is second highest | |
| 4 | L4₹6.2 L+₹1.4 L (27.9%)Accepted-Finance | L4 | Accepted-Finance Rate quoted is highest |
Tender Value
₹8.0 L
EMD Value
₹8,000
Closing Date
5 Oct 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
SHIFTING AND DISMANTLING OF 40MVA 132/33KV T/F AT 132KV S/s DARSHAN NAGAR ALONG WITH ATTENDING OIL LEAKAGE, CENTRIFUGING AND OTHER ASSOCIATED WORK ON 63MVA T/F FOR ERECTION AND COMMISSIONING AT 132KV S/S DARSHAN NAGAR UNDER ETD, AYODHYA
2023_UPTCL_840053_1
T.No. 25/ETCS/2023-24
Open Tender
Electrical Works
Item Wise
15 days
Darshan Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
SE ETC Sultanpur
₹8,000
9 Oct 2023
18 Sept 2023
6 Oct 2023
18 Sept 2023
5 Oct 2023
18 Sept 2023
Amount
Complete dismantling of 132/33KV 40MVA T/F, Atlanta make, including opening of jumpers, removal of earthing, opening of Control Cable connections, drain out T/F oil in to oil drums up to required level, removal of all radiators, conservator tank, oil pipe line, HV/LV and neutral bushing, fan, and marshaling box etc. blanking maīn tank radiators, oil pipe lines, conservator tank, providing proper gasket along with nut and bolts etc.
Shifting of 40MVA, Atlanta make, T/F from plinth to safe place (up to 20 Meter Distance) after opening of jumpers, cutting of earthing and opening of cable connection etc., including turning of tank if required, including all T&P and work required to complete the job satisfactorily at 132KV S/S, Darshan Nagar, Ayodhya.
Additional shifting of 40MVA, Atlanta make, T/F for 200 Meter (@ 5 Meter/job at 132KV S/S, Ayodhya, if required.
Shifting of 40MVA, BHEL make, old damaged and already dismantled, T/F, Already laying in the switch-yard, to make space for shifting and turning of the 40MVA Atlanta make T/F and 63MVA TAL make T/F, for 250 Meter (@ 5 Meter/job at 132KV S/S, Ayodhya, if required.
Shifting of main tank of repaired 63MVA TAL make T/F (Sr. No.- SO-0000524, SC- 337, ESD- 403) from unloading place to plinth (up to 20 Meter Distance) with the help of rail, pulley device, slippers etc. including turning of tank, if required, including all T&P and work required to complete the job satisfactorily at 132KV S/S, Darshan Nagar, Ayodhya.
A. Additional shifting of 63MVA TAL make T/F for 150 Meter (@ 5 Meter/job at 132KV S/S, Ayodhya., if required.
Complete Erection of repaired 63MVA TAL make T/F (Sr. No.- SO-0000524, SC- 337, ESD- 403) by erection of radiators, conservator tank, all bushing with their turrets, connecting oil pipe, cooling fans, motor drive mechanism with tap changer, RTCC panel, and associated oil pipe line etc. to complete the job satisfactorily, including first filling of oil and topping up of T/F oil in tank, radiator pipe lines, conservator tank etc. and attending oil leakage, if any and all other associated work for satisfactory completion of work along with arrangement of labour and T&P with operations to complete the job in all respect.
Centrifuging of complete T/F oil in T/F & Tank by connecting Centrifuging pipes, circulating the T/F oil through centrifuging machine to be provided by the contractor & taking the BDV value of the oil periodically till the required value is achieved as per direction of supervising engineer, all T&P, labour, and centrifusing machine shall be provided by the contractor.
Complete earthing of erected 63MVA TAL make T/F (Sr. No.- SO-0000524, SC- 337, ESD- 403) as per standard practice using 75x10mm. M.S. flat, Neutral Bushing, Body, main tank of the T/F, marshaling box, drive mechanism of cooling fan, and all related 132KV and 33KV equipments, etc shall be earthed as per standard practice (MS flat and earthing electrodes shall be provided by the Contractor)
7x10mm MS Flat
50x6mm MS Flat
25x6mm MS Flat
Jumpering of 63MVA TAL make T/F (Sr. No.- SO-0000524, SC- 337, ESD- 403) of HV and LV side with equipment and Jack Bus with required Conductor
Laying of following size control cables in the cable trenches from control panel to marshaling boxes / equipment / junction boxes etc. in switch-yard for new 63MVA T/F as per cable schedule along with sadling at every 750mm distance with MS saddles of size 25x3mm including carriage of cable drums from store to laying site and shifting back to store after completion of work and termination of new control cables for 63 MVA T/F from control and relay panel to marshelling box / equipment / JB etc. for new 63MVA T/F as per cable schedule and inter-connection with control cable at marshalling box and OLTC panel to RTCC panel FCC to each fan with ferruling and dressing and associated work to complete the job satisfactorily as per technical specification.
2 core x 2.5mm2 unarmoured
4 core x 2.5mm2 unarmoured
6 core x 2.5mm2 unarmoured
10 core x 2.5mm2 unarmoured
Proper packing of HV/LV bushing including proper wrapping with polythene /paper sheets in the wooden crated got emplied after taking out bushing of 40 MVA T/F.
Dismantling of 120KV LA (03 Nos.), 30KV LA (03 Nos.), 132KV CT (03 Nos.) and 33KV CT (03 Nos.) opening of jumpers, cutting of earthing etc., and related associated works to complete the job satisfactorily in all respect.
Proper packing of HV/LV bushing including proper wrapping with polythene /paper sheets in the wooden crated got emplied after taking out bushing of 63 MVA T/F.
Erection of following equipment including shifting of material / equipment from store place to erection site, including all other associated work, to complete the job satisfactorily.
120KV LA with surge counter with Structure
30KV LA with Structure
33KV CT (2000-1250A/1-1-1A) with junction Box and with Structure and CTR set at 1250/1-1-1A
145KV CT (400-200-100A/1-1-1A) with junction Box and with Structure and CTR set at 400/1-1-1A
Transfer Oil sample collection, testing of transformer oil at CPRI/ERDA lab, Noida and finishing test report for a- Dissolve Gas Analysis Test- 01 Nos. b- Breakdown Voltage Test- 01 Nos. c- Water Content Test- 01 Nos.
Replacement, modification, providing and fixing of auxiliary CT of ratio 0.6875/0.883A in relay & control panel of 40MVA T/F, including proper wiring works etc. with mounting arrangements, the job includes dismantling of old auxiliary CT.
M/S DHIRENDRA SINGH
TAJ ENTERPRISES
MAYA DEVI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .