Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAccepted-AOC | ₹36.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹36.3 LRejected-AOC | ₹36.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI VENKATESWARA ELECTRICALS L1 | SSK ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Compound wall @ PHC and BPHC in Perambakkam Panchayat | |||||
| 2.00 | Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour chargesetc. Complete as per SS 20 B. | 177.48 | m3 | 263 ₹46,677.24 | 263 ₹46,677.24 |
| 3.00 | Filling with good dry river sand including cost and conveyance to site and labour charges for filling, watering, tamping etc. complete | 14.64 | m3 | 2,092 ₹30,626.88 | 2,092 ₹30,626.88 |
| 4.00 | Cement Concrete 1:4:8 using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc | 14.64 | m2 | 5,922 ₹86,698.08 | 5,922.35 ₹86,703.20 |
| 5.00 | Brickwork in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site mixing, palcing, curing and all labour charges etc. complete | 124.03 | m3 | 6,285 ₹7.8 L | 6,285.84 ₹7.8 L |
| 6.00 | Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc. complete. | 3.73 | mt | 91,858 ₹3.4 L | 91,858.5 ₹3.4 L |
| 7.00 | Reinforcement Cement Concrete 1:1.5:3 (One cement, One and Half sand, Three Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly for all RCC including cost conveyance and all labour charges etc. complete. | 45.62 | m3 | 9,806 ₹4.5 L | 9,806 ₹4.5 L |
| 8.00 | Above basement | 19.6 | m3 | 9,947 ₹1.9 L | 9,947.07 ₹1.9 L |
| 9.00 | Providing centering and shuttering for all RCC items including cost , conveyance and all labour charges etc complete | 182.56 | m2 | 547 ₹99,860.32 | 547.5 ₹99,951.60 |
| 10.00 | Above basement | 280.8 | m2 | 1,095 ₹3.1 L | 1,095 ₹3.1 L |
Tender Value
₹36.0 L
EMD Value
₹36,100
Closing Date
22 Oct 2025, 3:00 pmClosed
BDO (B.P)Kadambathur block
BDO (B.P)Kadambathur block
Construction of Compound wall at PHC and BPHC in Perambakkam Panchayat
2025_RDTN_611828_1
Rc No 655/2025 /A2 dt 06.10.2025
Open Tender
Civil Works
Kadambathur block
Pre Qualification Details
4 documents required · 4 mandatory
₹0
₹36,100
Yes
4 Feb 2026
7 Oct 2025
22 Oct 2025
7 Oct 2025
22 Oct 2025
7 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_731076.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_731076.xls
BOQ • 0.30 MB
Pricebid01.pdf
Additional Documents • 0.64 MB
Download all tender documents and submit your bid