| 1 | L1₹6.6 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹6.8 L+₹16,834 (2.56%)Rejected-AOC NO 3 449 A VEERAMAMUNIVAR STREET MOGAPAIR EAST CHENNAI 600 037 | THIRUVALLUR | TAMIL NADU | 600037 | L2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | BMG ENTERPRISES L1 | NAVEEN ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.001. CONSTRUCTION OF MINI CSC GIRL(TYPR III) IN PUPS, KUMARAPETTAI @ KUMARAPETTAI PANCHAYAT IN ELLAPURAM PANCHAYAT UNION UNDER SBM(G) /2026 - 2027/ RD/TVLR/ELP/KUMARAPETTAI | |||||
| 2.00 | Earth work excavation in all soils and subsoils for foundation including all charges as per SS20B | 23.39 | CUM | 260 ₹6,081.4 Lowest | 270 ₹6,315.3 |
| 3.00 | Filling with M-Sand filling including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. Completed | 4.14 | CUM | 2,400 ₹9,936 Lowest | 2,500 ₹10,350 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 4.14 | CUM | 6,200 ₹25,668 | 6,100 ₹25,254 Lowest |
| 5.00 | Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed.. | 0.74 | MT | 92,000 ₹68,080 Lowest | 95,000 ₹70,300 |
| 6.00 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed. Below GL | 14.15 | SQ.M | 548 ₹7,754.2 Lowest | 550 ₹7,782.5 |
| 7.00 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed..Above GL | 36.12 | SQ.M | 1,090 ₹39,370.8 Lowest | 1,200 ₹43,344 |
| 8.00 | RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed.. | 8.27 | CUM | 9,100 ₹75,257 Lowest | 9,350 ₹77,324.5 |
| 9.00 | Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,.. Below Basement | 6.64 | CUM | 6,200 ₹41,168 Lowest | 6,200 ₹41,168 Lowest |
| 10.00 | Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..Above Basement | 11.38 | CUM | 6,250 ₹71,125 Lowest | 6,250 ₹71,125 Lowest |
Tender Value
₹6.8 L
EMD Value
₹7,000
Closing Date
28 Aug 2026, 3:00 pmClosed
BDO,Ellapuram
BDO,Ellapuram
CONSTRUCTION OF MINI CSC GIRLS AT PUES, KUMARAPETTAI IN KUMARAPETTAI PANCHAYAT
2026_RDTN_693400_1
Rc.No.927/2026/A9 Dt.11.08.2026
Open Tender
Civil Works
Item Rate
180 days
Ellapuram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
Yes
8 Sept 2026
11 Aug 2026
28 Aug 2026
11 Aug 2026
28 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. CONSTRUCTION OF MINI CSC GIRL(TYPR III) IN PUPS, KUMARAPETTAI @ KUMARAPETTAI PANCHAYAT IN ELLAPURAM PANCHAYAT UNION UNDER SBM(G) /2026 - 2027/ RD/TVLR/ELP/KUMARAPETTAI | - | - | - | - |
| 2 | Earth work excavation in all soils and subsoils for foundation including all charges as per SS20B | 23.39 | CUM | 263.78 | ₹6,169.81 |
| 3 | Filling with M-Sand filling including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. Completed | 4.14 | CUM | 2,445.47 | ₹10,124.25 |
| 4 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 4.14 | CUM | 6,308.47 | ₹26,117.07 |
| 5 | Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed.. | 0.74 | MT | 91,902.66 | ₹68,007.97 |
| 6 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed. Below GL | 14.15 | SQ.M | 547.5 | ₹7,747.13 |
| 7 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed..Above GL | 36.12 | SQ.M | 1,095 | ₹39,551.4 |
| 8 | RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed.. | 8.27 | CUM | 10,042.04 | ₹83,047.67 |
| 9 | Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,.. Below Basement | 6.64 | CUM | 6,297.05 | ₹41,812.41 |
| 10 | Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..Above Basement | 11.38 | CUM | 6,389.92 | ₹72,717.29 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_833696.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_833696.xls
BOQ • 0.28 MB
TenderDocumentKumarapettai.pdf
Tender Documents • 0.58 MB
123.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .