Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | -22.66% | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.7 L+₹41,811.36 (7.90%)Admitted-Finance | -16.55% | ₹5.7 L+₹41,811.36 (7.90%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 L+₹45,643.49 (8.62%)Admitted-Finance | -15.99% | ₹5.7 L+₹45,643.49 (8.62%) | L3 | Admitted-Finance |
| 4 | L4₹6.8 L+₹1.5 L (28.7%)Admitted-Finance | -0.50% | ₹6.8 L+₹1.5 L (28.7%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Black Listed |
Tender Value
Refer Docs
EMD Value
₹20,529
Closing Date
3 Aug 2026, 3:00 pmClosed
DFO SF Kupwara
DFO SF Kupwara
Construction of Tin Shed as per estimate at Chandigam Nursery
2026_FD_317960_13
2026_SF_2027
Open Tender
Civil Works
Percentage
20 days
Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
CDP Bank Account of Dept of Social Foresty JK
₹20,529
11 Sept 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Tin Shed / Room at social Forestry Nursery Chandigam. | - | - | - | - |
| 2 | Earth work in excavation by mechanicall means in trenches for foundations, drains, pipes, cables etc.upto required depthh and size, including dressing of sides and ramming of bottoms, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil.Complete job. | 21.87 | Cum | 256.85 | ₹5,617.31 |
| 3 | Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. | 18.24 | Cum | 1,000 | ₹18,240 |
| 4 | P/ L in position cement concrete in 1:4:8(1 cement :4 coarse sand : 8 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering but including carriage(30km) of all materials from approved sources up to site of work complete. | 9.85 | Cum | 5,202.9 | ₹51,248.56 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 18.02 | Cum | 5,733.6 | ₹1,03,319.47 |
| 6 | Reinforced cement concrete work in 1: 1.5 : 3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)excluding the cost of centering, shuttering, finishing and reinforcement but including carriage of all materials from approved sources upto site of work complete. | 7.29 | Cum | 7,788.4 | ₹56,777.44 |
| 7 | Reinforcement for RCC work including straightening cutting, bending, placing in position and binding all complete (Thermo mechanically treated bars) including all carriages complete. | 729 | Kgs | 123 | ₹89,667 |
| 8 | Centering & shuttering including strutting, propping etc including removal of form work. | 35.1 | Sqm | 286.35 | ₹10,050.89 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. including cost and carriage of all material involved complete. 50 mm thick with 20mm nominal size stone aggregate. | 39 | sqm | 562.15 | ₹21,923.85 |
| 10 | Supplying and filling in plinth with RBM/NALLAH MUCK including top 1'0" with fine sand under floors including, watering, ramming, consolidating and dressing complete. | 29.25 | cum | 800 | ₹23,400 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_1044981.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .