Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.4 L
EMD Value
₹6,950
Closing Date
15 Oct 2026, 6:55 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Development of Lateef Bab Astan Sharif Park at Wazapura Wathora
2026_RDPR_327099_35
NIT_86_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
CHADOORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹6,950
Yes
5 Oct 2026
5 Oct 2026
16 Oct 2026
5 Oct 2026
15 Oct 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling existing 1.80 m high GI chain-link fencing including cutting angle iron posts with angle grinder/gas cutter, removing chain-link mesh, tie wires, clamps, stays and other fixtures, stacking serviceable material within 50 m lead, complete as directed by the Engineer-in-Charge. Concrete foundations, if any, shall be measured and paid separately. | 22.56 | Rm | 130 | ₹2,932.8 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by the Engineer in-charge. | 0.64 | Cum | 479.3 | ₹306.75 |
| 3 | Providing and Laying of stone soling hand-packed on level in foundation; complete job including the cost of carriage from the source to site. | 0.65 | Cum | 1,265 | ₹822.25 |
| 4 | Providing and laying in position cement concrete of specified grade Of 1:3:6 mix ( 1 cement : 3 coarse sand: 6 graded stone agg. 20 mm nominal size, excluding cost of centering and shuttering all work up to plinth level. | 2.62 | Cum | 5,733.6 | ₹15,022.03 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of formwork for: Foundations, footings, bases for columns. | 17.19 | Sqm | 286.35 | ₹4,922.36 |
| 6 | 12mm thick Cement-Sand Plaster in 1:6 mortar mix | 25.79 | Sqm | 266.2 | ₹6,865.3 |
| 7 | Carriage of Stone & Fine Aggregate-Average Lead 10 Km | 3.54 | Cum | 279.04 | ₹987.8 |
| 8 | Structural steel welded in built up sections trusses and framed work incl. cutting hoisting fixing in positon and applying a priming coat of approved steel primer. all complete (Serviceable). Ornamental Fencing | 150 | Kg | 25 | ₹3,750 |
| 9 | Structural steel welded in built up sections trusses and framed work incl. cutting hoisting fixing in positon and applying a priming coat of approved steel primer. all complete. Ornamental Fencing | 682.5 | Kg | 138.2 | ₹94,321.5 |
| 10 | Painting with ready mixed synthetic enamel paint of approved brand and manifacture in all shades to give an even shade (new steel work two or more coats) | 55.71 | Sqm | 131.85 | ₹7,345.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1106544.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .