Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
28 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CPO-NORTH ZONE
SUPPLY AND INSTALLATION OF DISPLAY BOARDS AT VARIOUS STATIONS UNDER HPCL RRKPL.
2600028026-HD-07100
5100028026
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹6,000
7 Oct 2026
7 Oct 2026
28 Oct 2026
28 Oct 2026
7 Oct 2026 - 26 Oct 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | DSGN & SUP - FOAM | DSGN & SUP - FOAM — DESIGNING, PRINTING, SIZING AND SUPPLY OF FOAM SHEET BOARD WITH ECOSOLVENT VINYL PRINT. BOARDS/STICKERS SIZE AND CONTENT SHALL VARY AS PER REQUIREMENT AND CONTENT MAY BE PRINTED IN ANY OF THE LANGUAGE (ENGLISH/HINDI/GUJARATI). | - | square meter |
| 2 | SUP & FIX - VINYL | SUP & FIX - VINYL — PROVIDING AND FIXING IN POSITION VINYL STICKERS OF APPROVED MAKE WITH LAMINATE FILM ON GLASS PARTITION/GLASS ON DOORS ETC. AS PER THE APPROVED DESIGN AND PATTERN MENTIONED IN THE DRAWING APPROVED BY HPCL ENGINEER-IN-CHARGE. BEFORE COMMENCEMENT OF JOB, CONTRACTOR HAS TO FINALIZE THE DESIGN/PATTERNS/LOGOS/WORDINGS ETC. IN CONSULTATION WITH HPCL ENGINEER-IN- CHARGE AND GET IT APPROVED BY HPCL PRIOR TO THE COMMENCEMENT OF THE JOB. OUTER BORDER OF THE FILM SHALL BE CONSIDERED FOR PAYMENT. | - | square meter |
| 3 | SUP & FIX - ACP | SUP & FIX - ACP — PROVIDING AND FIXING 4.5 MILLIMETRE THICK ALSTONE ACP SHEETS FIXED IN ALUMINIUM DOORS, WINDOWS, SHUTTERS AND PARTITION FRAMES WITH C P BRASS/STAINLESS STEEL SCREWS ETC. (INCLUDING WASTAGES) COMPLETE AS PER DIRECTIONS OF ENGINEER-IN-CHARGE. | - | square meter |
| 4 | SPLY & FAB OF STR | SPLY & FAB OF STR — STRUCTURAL STEEL FOR GENERAL PURPOSE: SUPPLYING, FABRICATING, WELDING, ERECTING AND FIXING IN POSITION STEEL STRUCTURES AT ALL ELEVATIONS FOR GENERAL PURPOSE USING STRUCTURAL STEEL SECTIONS ISMB/ISMC/ISA CONFORMING TO IS:2062, INCLUDING CUTTING, WELDING OR BOLTING, SUPPLY OF BOLTS/NUTS/WASHERS ETC. COMPLETE AS PER DRAWINGS INCLUDING SURFACE PREPARATION AND APPLYING TWO COATS OF ZINC PHOSPHATE PRIMER AND TWO COATS OF SYNTHETIC ENAMEL PAINT AS PER SPECIFICATION, INCLUDING ALL MATERIALS AND LABOUR COMPLETE. THE RATE QUOTED SHALL INCLUDE COST OF BOLTS, NUTS, WASHERS, WELDING AND ELECTRODES AND ANY OTHER CONSUMABLES REQUIRED FOR COMPLETING THE WORK. NUT BOLTS SHALL NOT BE CONSIDERED FOR PAYMENT.THEORETICAL WIGHT OF STEEL SECTIONS SHALL BE CONSIDERED FOR PAYMENT. | - | Metric ton |
| 5 | EXCAVATION | EXCAVATION — As per scope of work | - | cubic meter |
| 6 | SUP & LAY - | SUP & LAY - — PCC 1:2:4 FOR GROUTING ANGLE PROVIDING AND LAYING PCC 1:2:4 MIX USING 20 TO 12 MM STONE AGGREGATE INCLUDING MIXING, PROVIDING NECESSARY SHUTTERING, COMPACTION AND CURING. | - | cubic meter |
| 7 | DSGN & SUP - FOAM | DSGN & SUP - FOAM — DESIGNING, PRINTING, SIZING AND SUPPLY OF FOAM SHEET BOARD WITH ECOSOLVENT VINYL PRINT. BOARDS/STICKERS SIZE AND CONTENT SHALL VARY AS PER REQUIREMENT AND CONTENT MAY BE PRINTED IN ANY OF THE LANGUAGE (ENGLISH/HINDI/GUJARATI). | - | square meter |
| 8 | SUP & FIX - VINYL | SUP & FIX - VINYL — PROVIDING AND FIXING IN POSITION VINYL STICKERS OF APPROVED MAKE WITH LAMINATE FILM ON GLASS PARTITION/GLASS ON DOORS ETC. AS PER THE APPROVED DESIGN AND PATTERN MENTIONED IN THE DRAWING APPROVED BY HPCL ENGINEER-IN-CHARGE. BEFORE COMMENCEMENT OF JOB, CONTRACTOR HAS TO FINALIZE THE DESIGN/PATTERNS/LOGOS/WORDINGS ETC. IN CONSULTATION WITH HPCL ENGINEER-IN- CHARGE AND GET IT APPROVED BY HPCL PRIOR TO THE COMMENCEMENT OF THE JOB. OUTER BORDER OF THE FILM SHALL BE CONSIDERED FOR PAYMENT. | - | square meter |
| 9 | SUP & FIX - ACP | SUP & FIX - ACP — PROVIDING AND FIXING 4.5 MILLIMETRE THICK ALSTONE ACP SHEETS FIXED IN ALUMINIUM DOORS, WINDOWS, SHUTTERS AND PARTITION FRAMES WITH C P BRASS/STAINLESS STEEL SCREWS ETC. (INCLUDING WASTAGES) COMPLETE AS PER DIRECTIONS OF ENGINEER-IN-CHARGE. | - | square meter |
| 10 | SPLY & FAB OF STR | SPLY & FAB OF STR — STRUCTURAL STEEL FOR GENERAL PURPOSE: SUPPLYING, FABRICATING, WELDING, ERECTING AND FIXING IN POSITION STEEL STRUCTURES AT ALL ELEVATIONS FOR GENERAL PURPOSE USING STRUCTURAL STEEL SECTIONS ISMB/ISMC/ISA CONFORMING TO IS:2062, INCLUDING CUTTING, WELDING OR BOLTING, SUPPLY OF BOLTS/NUTS/WASHERS ETC. COMPLETE AS PER DRAWINGS INCLUDING SURFACE PREPARATION AND APPLYING TWO COATS OF ZINC PHOSPHATE PRIMER AND TWO COATS OF SYNTHETIC ENAMEL PAINT AS PER SPECIFICATION, INCLUDING ALL MATERIALS AND LABOUR COMPLETE. THE RATE QUOTED SHALL INCLUDE COST OF BOLTS, NUTS, WASHERS, WELDING AND ELECTRODES AND ANY OTHER CONSUMABLES REQUIRED FOR COMPLETING THE WORK. NUT BOLTS SHALL NOT BE CONSIDERED FOR PAYMENT.THEORETICAL WIGHT OF STEEL SECTIONS SHALL BE CONSIDERED FOR PAYMENT. | - | Metric ton |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600028026-HD-07100.pdf
TENDER_DOCUMENT • 14.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .