| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Quoted Lowest rate and
Executed Agreement on 19.06.2023 after negotiation |
| 2 | L2₹1.9 Cr+₹5.4 L (2.93%)Rejected-Finance | ₹1.9 Cr+₹5.4 L (2.93%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
8 May 2023, 3:00 pmClosed
Additional Collector (Dev), DRDA ,Thoothukudi
O/O AC (D) / PD DRDA Thoothukudi
Thoothukudi District-MGSMT 2022-23-Strengthening/Renewal of 2 No of Rural Roads in Ottapidaram Block Package No.TN/TUT-40/MGSMT-2022-23
2023_RDTN_303653_33
CRDPR,Chennai Lr.No. DIPR/2018/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹1.9 L
O/O AC (D) / PD DRDA Thoothukudi
12 Jul 2023
19 Apr 2023
8 May 2023
19 Apr 2023
8 May 2023
29 Apr 2023
26 Apr 2023
Amount
Renewal BT of Kappikulam road Km 0/0 - 1/0 in Ottapidaram Union (R-81)(Plastic waste)
Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0-1/0
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A Km 0/0-1/0
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete . ( PCSC with Plastic waste using Paver ) Km 0/0 - 1/0
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 KM0/0-1/0
KM Stone
HM Stone
Nameboard cum Citizen Board
sign Board (1 curve 2 nos)
60 cm Circle Mandatory signboard
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
Strengthening of Veppalodai- Vadakku Kalmedu Road R -36) 0/0-2/086 in Veppalodai Panchayt in Ottapidaram Union
Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0-2/086
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A Km 0/0-2/086
Picking the existing worn out BT surface including all labour charges etc complete KKm 0/0-2/086
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-2/086
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all Charges. Km 0/0-2/086
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km0/0-2/086
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0/0-2/086
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Km 0/0-2/086
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. Km 0/0-2/086
HM Stone
KM Stone
Nameboard cum Citizen Board
sign Board (1 curve 2 nos)
60 cm Equilateral Triangle cautionary signboard
Construction of 2.00 m span RCC Slab culvert at ch 30 m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,as per SS 20B
Supplying and filling foundation with filling sand in layers not more than 15 cm thick well rammed watered and compacted complete with standard specification
Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges for mixing,charges etc completed
Plain Cement concrete 1:3:6 using 20mm hbg jelly for dummy column including all cost and conveyance of all materials to site and all labour charges for mixing,charges etc completed
Plain Cement concrete 1:3:6 using 20mm hbg jelly for dummy column including all cost and conveyance of all materials to site and all labour charges for mixing,charges etc completed
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Above sill - with struting)
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying, fabricating and placing in position mild steel reinforcement using mild steel or ribbed tor steel rods for all RCC works as per the design given including cost of steel and binding wire etc. in all the floors. binding wire etc. in all the floors. Complete complying with standard specifications.
Providing and fixing of 6 mm bitumen pad for Expansion joint etc complete
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weep holes with 100 mm dia AC pipe Extending through the full width etc complete
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of culvert at ch 150 m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below sill
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below sill
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above sill
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Above sill - with struting)
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all material and all labour charges etc complete
Supplying and fabrication of steel and binding wires including cost and conveyane of all labour and material charges etc complete
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar paper etc complete
Providing weep holes with 100 mm dia AC pipe Extending through the full width etc complete
Construction of culvert at ch 298 m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below sill
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below sill
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above sill
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Above sill - with struting)
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all material and all labour charges etc complete
Supplying and fabrication of steel and binding wires including cost and conveyane of all labour and material charges etc complete
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar paper etc complete
Providing weep holes with 100 mm dia AC pipe Extending through the full width etc complete
Construction of 2 span 5 m culvert at ch 0/710
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Plain Cement concrete 1:4:8 using 40mm hbg jelly for dummy column including all cost and conveyance of all materials to site and all labour charges for mixing,charges etc completed
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Above sill - with struting)
Cement concrete 1:3:6mix using 40 mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Supplying, fabricating and placing steel in position including cost and conveyance of materials and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Supply and fixing of Bitumen pad for expansion joints
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Providing and fixing Kraft Paper for full width of seating deck slab and including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges etc complete
Fillng behind abutments and wing with gritty gravel including and cost and conveyance of gravel to work site , laying, handling and filling in layers etc
HARDBED ch 2008-2086 m
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 53 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KASTHURI SUBBAREDDIAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .