| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC H NO 382 FINCITY ENCLAVE VILLAGE DAFTARPUR P O MUBARAKPUR TEHSIL DERABASSI DIST SAS NAGAR 140201 | DERABASSI | SAS NAGAR | PUNJAB | 140201 | ₹1.7 L Quoted ₹1.5 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹1.7 L+₹18,449.63 (12.2%)Rejected-AOC HARYANA HR | KARNAL | HARYANA | 132001 | ₹1.7 L+₹18,449.63 (12.2%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹1.7 L+₹18,618.89 (12.4%)Rejected-AOC 403 VIPIN KUMAR CONTRACTOR ADHAUN ADHAUN NEAR JAT PARK KURUKSHETRA KURUKSHETRA HARYANA KURUKSHETRA 136119 INDIA | KURUKSHETRA | HARYANA | 136119 | ₹1.7 L+₹18,618.89 (12.4%) | L3 | Rejected-AOC 3rd Lowest |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
3 Feb 2026, 10:15 amClosed
YOGESHWAR
HSVP DIV 1 Sec 8 Panchkula
Construction Rising of Sewer Manhole and Manhole Cover complete in all respect near Plot No.165 in I A Ph II and near Govt. School and other various points in Sector 19 Panchkula.
2026_HBC_499306_1
2026A0C98623 2C08 4A04 AB64 95F05FCEF9C9269HSV
Open Tender
Civil Works
Works
30 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
₹3,380
Yes
24 Jul 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
28 Jan 2026 - 3 Feb 2026
4.12.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil.
11.5.3:- 12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
10.100.2:- Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 40 mm size in foundation and plinth.
7.21.2:- Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar. 1:6 (1 cement: 6 coarse sand)
21.93.1:-Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1 :3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening
6.1.2:- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
6.14.2:- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to stone aggregate 20 mm nominal size)
6.33.3:- Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Cold twisted bars.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_577884.xls
BOQ • 0.25 MB
AD0149656.pdf
Additional Documents • 1.58 MB
Other Document
Other Document • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .