Tender Value
₹41.7 Cr
EMD Value
₹20.8 L
Closing Date
24 Aug 2026, 5:00 pmDue today
NMRDA Nashik
Joint Metropolitan Engineer NMRDA Nashik
Construction of Internal Roads of Industrial Town Planning Scheme Phase-I and Phase-II at Mauje Chincholi Tal. Sinnar Dist. Nashik
2026_NMRDN_1327034_1
NMRDA-Tender-7-2026-2027
Open Tender
Civil Works - Others
Item Rate
275 days
Chincholi Tal Sinnar
As Per NIT
2 documents required · 2 mandatory
₹3,540
Yes
₹20.8 L
Commissioner Nashik Metropolitan Region Developm
10 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 12,685.46 | Cubic Metre | - | - |
| 2 | Excavation for roadway in hard murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50metre and spreading for embankment or stacking as directed. | 6,520.46 | Cubic Metre | - | - |
| 3 | Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50metre and spreading or stacking as directed. | 3,627.91 | Cubic Metre | - | - |
| 4 | Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 meter and spreading for embankment or stacking as directed. | 2,537.09 | Cubic Metre | - | - |
| 5 | Providing earth work in embankment with approved materials obtained from departmental land upto lead of 50 meter including all lifts, laying in layers of 20 centimeter to 30 centimeter thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete.
(Material obtained from departmental Land) | 3,447.79 | Cubic Metre | - | - |
| 6 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 meter, not less than 97 % of standard Proctor density after laying them in layers of 20 centimeter to 30 centimeter with vibratory roller. | 7,161.51 | Cubic Metre | - | - |
| 7 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centimeter to 30 centimeter breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50 meter to 300 meter inclusive from the site of excavation to the site of deposition as directed. | 7,161.51 | Cubic Metre | - | - |
| 8 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 51,536.87 | Cubic Metre | - | - |
| 9 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 51,536.87 | Cubic Metre | - | - |
| 10 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | 1,66,358.12 | Square Metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_2272579.xls
BOQ • 0.38 MB
Chincoli.pdf
Tender Documents • 1.76 MB
ContractorsDeclaration.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].