| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.3 L+₹54,723.82 (11.6%)Admitted-Finance BLOCK S HOUSE 75 MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | L2 | Admitted-Finance | ||
| 3 | L3₹5.7 L+₹93,595.34 (19.8%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹6.1 L
EMD Value
₹8,000
Closing Date
13 Aug 2026, 3:00 pmClosed
Superintending Engineer
Electricity Transmission Circle Agra Kakraitha Road, Near Amar Ujala Press, Sikandara , Agra
Revetment Of Tower Loc. No. 62 B-0 type For 132KV Firozabad Pinahat S/C Line under ETD-III, Agra
2026_UPTCL_1166152_1
ET_25_ETC_A_26_27
Open Tender
Electrical Works
Lump-sum
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE_A_ETC_AGRA
₹8,000
23 Sept 2026
3 Jul 2026
14 Aug 2026
3 Jul 2026
13 Aug 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Revetment of tower foundation of tower loaction no. 62 (B+0) of 132KV Firozabad-Pinahat S/C Line under ETD-III, Agra as per drawing and specification. Following works are to be carried out by the contractor at site. | - | - | - | - |
| 2 | Excavation of earth with the help of T&P and labour, watering and ramming of excavated earth. | - | m3 | 150 | - |
| 3 | Concrete with 40mm stone ballast, coarse sand and cement mortar in ratio 1:3:6 in foundation and under floor including the cost of all material / labour and T&P etc. required for proper completion of satisfactorly work. | - | m3 | 3,500 | - |
| 4 | First class brick work for the construction of retaining wall in 1:4 mix ratio, cement and sand including the cost of material, labour and T&P etc. required for proper completion of job. | - | m3 | 3,500 | - |
| 5 | Concrete in plinth with 20mm stone ballast, coarse sand and cement mortar in ratio 1:2:4 including the cost of all material, labour and T&P etc. required for proper completion of work. | - | m3 | 5,600 | - |
| 6 | Earth filling under floor and in area between tower foundation and retaining wall in including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete with the cost of earth royalty, taxes, freight etc. with cost of material labour and T&P required for proper completion of work. | - | m3 | 250 | - |
| 7 | 12mm thick plaster work on wall & Top with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work. | 124 | m3 | 150 | ₹18,600 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tech.pdf
Tender Documents • 0.86 MB
BOQ_2187339.xls
BOQ • 0.30 MB
Extn_25.pdf
PDF • 0.38 MB
Extn_25.pdf
PDF • 0.38 MB
Extn_25.pdf
PDF • 0.38 MB
Extn_25.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .