Loading…
Loading…
Tender Value
₹25.3 L
EMD Value
₹25,309
Closing Date
28 Sept 2026, 5:00 pm5d left
COMMISSIONER, SMC
Commissioner Sambalpur Municipal Corporation
Development and Maintenance of Pothole free Roads and Covered Drain in Ward No.40
2026_ORULB_140994_10
28/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹25,309
Yes
18 Sept 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50M lead. | 160.53 | cum | 650.1 | ₹1,04,360.55 |
| 2 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer –in –charge | 44.89 | cum | 249.6 | ₹11,204.54 |
| 3 | Filling in foundatin and plinth with sand watered and rammed including cost of material with tax | 14.96 | cum | 826.11 | ₹12,358.58 |
| 4 | Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete. | 44.89 | cum | 320.6 | ₹14,390.13 |
| 5 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour ,materials with all taxes,lead ,T & P etc all complete . | 102.71 | cum | 5,794.71 | ₹5,95,174.66 |
| 6 | Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. | 102.71 | cum | 7,443.51 | ₹7,64,522.91 |
| 7 | R.C.C / Unreinforced C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete but excluding centring , shuttering cost of st | 12.6 | cum | 5,936.32 | ₹74,797.63 |
| 9 | Supplying, fitting, fixing and placing un coated HYSD bar reinforcement in proper position as per design including cutting, bending, binding and tying the grills including cost of steel , binding wire 18 to 20 Gauge and labour required for the work.. assuming steel @0.62 qtl/cum of total RCC qty of slabs | 12.6 | qntl | 8,332.79 | ₹1,04,993.15 |
| 11 | Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials complete in R.C.C. foundation , plinth band , guard wall of lesser height and footings bases of columns mass conc | 64 | sqm | 249.2 | ₹15,948.8 |
| 12 | Cleaning the existing black top/concrete surface including removal of binding materials and other foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous etc.complete. | 1,395 | sqm | 5.47 | ₹7,630.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_609914.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .