Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹45.4 L+₹3.1 L (7.43%)Rejected-Finance | L2 | Rejected-Finance Quoted rate more than L1 | |
| 3 | L3₹45.5 L+₹3.3 L (7.84%)Rejected-Finance | L3 | Rejected-Finance Quoted rate more than L1 | |
| 4 | L4₹46.1 L+₹3.9 L (9.22%)Rejected-Finance | L4 | Rejected-Finance Quoted rate more than L1 | |
| 5 | L5₹46.1 L+₹3.9 L (9.27%)Rejected-Finance | L5 | Rejected-Finance Quoted rate more than L1 |
| Sl No | Description | Qty | Unit | NIHAR ENTERPRISE L2 | MridulCh Baruah L6 | THE SUPPLY AGENCY L5 | 4S ASSOCIATES L1 | A M CHOUDHURY AND CO L7 | PEE BEE INDIA L4 | Chief Builders &Consultants L3 | M/S BARUA REFRIGERATION WORKS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. (ii) It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. (iii) (Applicable for all items/parts):- The bidders/contractors are advised to refer Notes on BOQ/SCH'A' before entry/quoting the rates. | |||||||||||
| 1.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 68.5 | Cum | 850 ₹58,225 Lowest | 975 ₹66,787.5 | 990 ₹67,815 | 850 ₹58,225 Lowest | 1,100 ₹75,350 | 990 ₹67,815 | 900 ₹61,650 | 850 ₹58,225 Lowest |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 170 | Sqm | 90 ₹15,300 | 95 ₹16,150 | 90 ₹15,300 | 85 ₹14,450 | 95 ₹16,150 | 90 ₹15,300 | 80 ₹13,600 Lowest | 95 ₹16,150 |
| 3.00 | Dismantling of AC (corrugated, semi corrugated etc) roof sheets including ridge and valley etc as in roof covering and segregating serviceable sheet for stacking and removing unserviceable materials from site of work complete all as specified and as directed. | 70 | Sqm | 55 ₹3,850 | 58 ₹4,060 | 55 ₹3,850 | 50 ₹3,500 | 40 ₹2,800 Lowest | 55 ₹3,850 | 55 ₹3,850 | 50 ₹3,500 |
| 4.00 | Dismantling timber boarding of any description fixed in any position secured with nails complete all as specified and as directed. | 85 | Sqm | 45 ₹3,825 | 52 ₹4,420 | 49 ₹4,165 | 45 ₹3,825 | 40 ₹3,400 Lowest | 49 ₹4,165 | 48 ₹4,080 | 52 ₹4,420 |
| 5.00 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 242 | Sqm | 45 ₹10,890 | 52 ₹12,584 | 49 ₹11,858 | 45 ₹10,890 | 40 ₹9,680 Lowest | 49 ₹11,858 | 48 ₹11,616 | 52 ₹12,584 |
| 6.00 | Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 17 | Each | 225 ₹3,825 | 195 ₹3,315 | 185 ₹3,145 | 170 ₹2,890 Lowest | 220 ₹3,740 | 185 ₹3,145 | 200 ₹3,400 | 195 ₹3,315 |
| 7.00 | Taking down wooden chowkats or frames woth shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 28 | Each | 200 ₹5,600 | 175 ₹4,900 | 165 ₹4,620 | 150 ₹4,200 Lowest | 245 ₹6,860 | 165 ₹4,620 | 185 ₹5,180 | 175 ₹4,900 |
| 8.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 30 | Sqm | 35 ₹1,050 | 35 ₹1,050 | 35 ₹1,050 | 30 ₹900 Lowest | 30 ₹900 Lowest | 35 ₹1,050 | 30 ₹900 Lowest | 35 ₹1,050 |
| 9.00 | Demolition of cement concrete (reinforced) of any description and any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) and removal of rubbish from the site complete all as specified and as directed. | 5 | Cum | 1,950 ₹9,750 | 2,070 ₹10,350 | 1,980 ₹9,900 | 1,800 ₹9,000 Lowest | 2,000 ₹10,000 | 1,980 ₹9,900 | 1,850 ₹9,250 | 2,070 ₹10,350 |
Tender Value
₹38.8 L
EMD Value
₹78,000
Closing Date
30 Apr 2026, 6:00 pmClosed
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
SPECIAL REPAIR TO BLDG NO T1 UPTO 35 MTR AT ROWRIAH UNDER GE JORHAT
2026_MES_759960_1
8303/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE JORHAT
As per NIT
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER JORHAT
₹78,000
Yes
29 Jul 2026
10 Apr 2026
2 May 2026
10 Apr 2026
30 Apr 2026
24 Apr 2026
10 Apr 2026 - 17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | - | Cum | - | - |
| - | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | - | Sqm | - | - |
| - | Dismantling of AC (corrugated, semi corrugated etc) roof sheets including ridge and valley etc as in roof covering and segregating serviceable sheet for stacking and removing unserviceable materials from site of work complete all as specified and as directed. | - | Sqm | - | - |
| - | Dismantling timber boarding of any description fixed in any position secured with nails complete all as specified and as directed. | - | Sqm | - | - |
| - | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | - | Sqm | - | - |
| - | Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | - | Each | - | - |
| - | Taking down wooden chowkats or frames woth shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | - | Each | - | - |
| - | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | - | Sqm | - | - |
| - | Demolition of cement concrete (reinforced) of any description and any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) and removal of rubbish from the site complete all as specified and as directed. | - | Cum | - | - |
| - | Demolition of cement concrete (unreinforced) in ground floors and paving n.exc. 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_851229.xls
BOQ • 0.67 MB
Tender_8303.rar
Tender Documents • 2.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .