Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹1.9 L+₹47,001 (33.6%)Rejected-AOC BHAGWATI NAGAR JAMMU | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹1.9 L+₹50,801 (36.3%)Rejected-AOC | L3 | Rejected-AOC Not Lowes | |
| 4 | L4₹1.9 L+₹54,301 (38.8%)Rejected-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L4 | Rejected-AOC Not Lowes |
Tender Value
₹1.9 L
EMD Value
₹5,850
Closing Date
12 May 2021, 12:00 pmClosed
Executive Engineer MICD Jammu
Office of the Executive Engineer Mechanical Irrigation Construction Division, Jammu
Repairs to 400 KVA LT Electric Transformer along with allied works at LIS Seen Thakran
2021_IFC_122859_1
ENIT NO MICD/J/01 DATED 22/04/2021
Open Tender
Electrical and Maintenance Works
Lump-sum
10 days
Udhampur
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer MICD
₹5,850
Yes
5 Jun 2021
22 Apr 2021
12 May 2021
23 Apr 2021
12 May 2021
23 Apr 2021
Repair to 400 KVA LT electric transformer installed at LIS Seen Thakran by way of disconnecting of HT and LT line connections from transformer. Removing the top cover after unscrewing all the nuts and bolts along with dismantling of HT & LT bushes. Taking out the coil assembly using chain pulley and other allied tools and tackles. Dismantling of damaged HT coils from the coil assembly at site. Draining out of transformer oil from container at site. Carriage of coils along with old transformer oil to road side using tools, tackles and manual labour through hilly terrain. Loading in mechanical transport for further shifting to workshop for repairs. Dismantling of coils at workshop and rewinding of HT coils with the copper wire of requisite specifications as per original design and varnishing complete. Dehydrating/drying the coils by keeping in oven. Filtration of old transformer oil by giving proper heat treatment. Then carriage back of newly rewinded coils and transformer oil along with other allied material to the site of installation in similar manner. Servicing, cleaning and flushing of oil tank by using appropriate chemicals to clean all the deposits. Fitting of the newly rewinded coils to the legs of the coil assembly and fitting of the core and making connections of the coil assembly. Lowering of the coil assembly in the container after making proper connections. Filling of filtered transformer oil and topping up of new transformer oil 150 litres approximately. Providing and fitting of HT bush rod-3 Nos., LT bush rod-4 Nos., set of gaskets, sundry items and insulation etc. required. Complete assembling of transformer. Making all the electrical connections on HT and LT side by P/F thimbles of required size/rating along with proper insulation. Checking for continuity, insulation and Putting the transformer on no load till required megger value is obtained. Complete Job includes cost of material, labour charges, installation, carriage, shifting, testing and commissioning on full load at LIS Seen Thakran.
PERFECT ELECTRICAL WORKS
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
NATIONAL ELECTRO-MECH COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .