Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹1.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.6 CrAdmitted-Finance ANUPPUR M P | ₹1.6 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical shortfall of documents |
| 5 | Rejected-Technical | - | - | Rejected-Technical shortfall of documents |
| Sl No | Description | Qty | Unit | M/S. DUBEY AND COMPANY L3 | SANTOSH KUMAR SINGH L1 | ABADH KISHOR SHARMA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 279.9 | m3 | 9,552 ₹26.7 L | 9,260.01 ₹25.9 L | 9,625 ₹26.9 L |
| 2.00 | Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation | 98.35 | m3 | 9,265 ₹9.1 L | 8,983.41 ₹8.8 L | 9,350 ₹9.2 L |
| 3.00 | Brick work in super structure, above plinth level up to floor-2 level | 391.09 | m3 | 10,574 ₹41.4 L | 10,251.15 ₹40.1 L | 10,700 ₹41.8 L |
| 4.00 | Transporation(Track line lead =0-1 km, Manual lead = 0-50 mt.) | 489.44 | m3 | 10,350 ₹50.7 L | 10,035.77 ₹49.1 L | 10,000 ₹48.9 L |
| 5.00 | 12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site. | 433.44 | m2 | 527 ₹2.3 L | 511.61 ₹2.2 L | 550 ₹2.4 L |
| 6.00 | Transporation(Track line lead =0-1km, Manual lead = 0-50 mt.) | 433.44 | m2 | 176 ₹76,285.44 | 171.02 ₹74,126.25 | 180 ₹78,019.20 |
| 7.00 | Applying white wash, one coat to give an even shade in U/G mine excluding carriage from incline mouth to U/G site. | 1,844.16 | m2 | 19.61 ₹36,163.98 | 19.01 ₹35,053.57 | 19.8 ₹36,514.37 |
| 8.00 | Transporation(Track line lead =0-1 km, Manual lead = 0-50 mt.) | 0.26 | MT | 9,900 ₹2,574 | 9,597.52 ₹2,495.36 | 10,000 ₹2,600 |
| 9.00 | Carting of coal/shale/shaly coal in U/G mine by manual loading, unloading and stacking for lead up to 50 M | 362.7 | m3 | 955 ₹3.5 L | 926.02 ₹3.4 L | 970 ₹3.5 L |
| 10.00 | Neat cement punning work on Isolation stoppings for smooth finishing and stopping leakages. | 14 | m2 | 124 ₹1,736 | 119.69 ₹1,675.67 | 125 ₹1,750 |
Tender Value
₹1.5 Cr
EMD Value
₹1.8 L
Closing Date
2 Apr 2026, 5:00 pmClosed
STAFF OFFICER MINING
Office of the General Manager, Orient Area, MCL, Brajrajnagar, Jharsuguda, Odisha
Underground construction of 14 nos of Sectionalisation Stoppings (Bricks)in HBM, RSA, OA, MCL
2026_MCL_356898_1
MCL/GM/OA/SOM/2025/NIT282/2099
Open Tender
Civil Works - Others
112 days
HIRAKHAND BUNDIA MINES
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.8 L
23 May 2026
17 Mar 2026
3 Apr 2026
18 Mar 2026
2 Apr 2026
18 Mar 2026
18 Mar 2026 - 26 Mar 2026
Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C.
Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation
Brick work in super structure, above plinth level up to floor-2 level
Transporation(Track line lead =0-1 km, Manual lead = 0-50 mt.)
12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site.
Transporation(Track line lead =0-1km, Manual lead = 0-50 mt.)
Applying white wash, one coat to give an even shade in U/G mine excluding carriage from incline mouth to U/G site.
Transporation(Track line lead =0-1 km, Manual lead = 0-50 mt.)
Carting of coal/shale/shaly coal in U/G mine by manual loading, unloading and stacking for lead up to 50 M
Neat cement punning work on Isolation stoppings for smooth finishing and stopping leakages.
Transporation(Track line lead =0-1 km, Manual lead = 0-50 mt.)
Two or more coats of black paint of approved brand on Isolation stoppings for Sign. Board.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.46 MB
Tendernotice_2.pdf
PDF • 2.33 MB
BOQ_369757.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid