Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC VILLAGE GARHI HARSARU GURUGRAM VILLAGE GARHI HARSARU GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.0 L+₹75,746.04 (6.75%)Rejected-AOC 159A VILLAGE BAJGHERA MAJOR VINOD RANA MARG GURUGRAM HARYANA 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | L2 | Rejected-AOC L2 | |
| 3 | L3₹12.4 L+₹1.2 L (10.8%)Rejected-AOC 314 20 SHAKTI NAGAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹14.2 L+₹3.0 L (26.9%)Rejected-AOC NEAR GOVT MIDDLE SCHOOL VILLAGE KHERI SANWAL TEHSIL AND DISTRICT CHARKHI DADRI | CHARKHI DADRI | CHARKHI DADRI | HARYANA | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical VILL SAKRAS TEHSIL F P JHIRKA DISTT NUH | NUH | HARYANA | 122103 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Guru Engineering Works L3 | BIJAY SINGH L1 | PAWAN KUMAR CONTRACTOR L4 | LOHANS GROUP L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply and topping of 200 KVA and 315 KVA transformer Silicone Transformer Oil - High Dielectric Strength Fluid in conservator tank and including replacement of dirty silica gel in transformers. | 120 | Litre | 99 ₹11,880 Lowest | 120 ₹14,400 | 120 ₹14,400 | 100 ₹12,000 |
| 2.00 | Repair and testing including over hauling of 11kv HT Coil and HT Rod 200 KVA Transformer replacement of its defective coil/rod. | 2 | Each | 48,000 ₹96,000 | 23,000 ₹46,000 Lowest | 25,000 ₹50,000 | 24,000 ₹48,000 |
| 3.00 | operation of tubewell /boosting station (22664) | 12 | Each | 20,000 ₹2,40,000 | 16,000 ₹1,92,000 Lowest | 25,000 ₹3,00,000 | 19,985 ₹2,39,820 |
| 4.00 | Repair of submersible/horizontal pumping sets more than 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | 2,145 | Per Month | 124 ₹2,65,980 | 104 ₹2,23,080 Lowest | 135 ₹2,89,575 | 112.5 ₹2,41,312.5 |
| 5.00 | Repair of submersible/horizontal pumping sets upto 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | 2,001 | Per Month | 154 ₹3,08,154 | 119 ₹2,38,119 | 145 ₹2,90,145 | 102.5 ₹2,05,102.5 Lowest |
Tender Value
₹14.1 L
EMD Value
₹28,184
Closing Date
1 May 2026, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurugram
Operation and maintenance of boosting stations and tubewell in Ward 12, Division 3A under MCG. Re-call
2026_HRY_517331_1
2026B26E3AD3 D431 45CF B989 72409B76FF52285ULB
Open Tender
Civil Works
Works
140 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹28,184
Yes
8 May 2026
24 Apr 2026
1 May 2026
24 Apr 2026
1 May 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and topping of 200 KVA and 315 KVA transformer Silicone Transformer Oil - High Dielectric Strength Fluid in conservator tank and including replacement of dirty silica gel in transformers. | - | Litre | - | - |
| 2 | Repair and testing including over hauling of 11kv HT Coil and HT Rod 200 KVA Transformer replacement of its defective coil/rod. | - | Each | - | - |
| 3 | operation of tubewell /boosting station (22664) | - | Each | - | - |
| 4 | Repair of submersible/horizontal pumping sets more than 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | - | Per Month | - | - |
| 5 | Repair of submersible/horizontal pumping sets upto 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | - | Per Month | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_596203.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .