Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹52,541.29Accepted-AOC | 1 | Accepted-AOC L-1 |
Tender Value
₹35,000
Closing Date
11 Mar 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer, Provincial Division No.2, PWD BR Br., Karnal
Re-inivted Special repair for renovation of Primary Health Centre at village Salwan in Karnal Distt
2020_HRY_120880_1
Re-invited Special repair for renovation of Primar
Open Tender
Civil Works
Works
90 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
Executive Engineer Provinical Division No. 2 Karna
Yes
10 Aug 2021
29 Feb 2020
12 Mar 2020
29 Feb 2020
11 Mar 2020
29 Feb 2020
Amount
Dismantling of brick work tile masonry or tile lining and tile terracing. (d) in mud tile terracing (8.5(d)
Dismantling cement concrete plain 1:2:4 [HSR8.6(d)]
Cement concrete 1:3:6 with stone aggregates 20mm nominal size in Foundation & plinth(HSR 10.40)
Cement concrete 1:1½:3 with stone aggregate 20mm nominal size in pavement,roads, taxi-tracks and runways, laid to required slope and camber, including consolidation, finishing and tamping complete (HSR10.132 + 10.95 a)
Tile terracing with one layer of tiles, 22.86 cm x 11.43 cm x 3.81cm laid dry over a layer of mud mortar including grouting with cement sand mortar 1:3 and top surface to be left clean (HSR 13.14).
Recovery items:- The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Dismantiling of bricks and Removing of Door and windos in the DNIT. In case it is not possible to use this material on the work, the agency can take away this material after approval from employer. This material will be issued at the price quoted by the agency. However the reserve price is as under:- i) Good Tiles @ 5.20/- Each
ii) Brick Bats @ 450/- cum Note:- All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this building. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. Note:- 1. In case of any difference in the unit & nomenclature of any of the HSR Items of Civil, P.H. work depicted in this DNIT and that given in HSR, the unit and nomenclature given in HSR shall be applicable. 2. Only reputed make material will be used (make/brand exhibited in HSR and exhibited in approved standard document) as approved by Engineer-in-charge, while executing various items/works at site.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .