Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-Finance | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹11.3 L+₹18,792.40 (1.70%)Rejected-Finance | L2 | Rejected-Finance Not Lowest Bidder |
Tender Value
₹12.4 L
EMD Value
₹24,900
Closing Date
19 Sept 2026, 4:00 pmClosed
Executive Engineer HIMUDA
HIMUDA Division Dharamshala
Repair work
2026_HIMUD_142970_1
HIMUDA/DD/2025-5201-08
Open Tender
Civil Works
Percentage
90 days
Dhar
Please refer Tender documents.
9 documents required · 9 mandatory
₹590
Yes
₹24,900
Yes
24 Sept 2026
8 Sept 2026
21 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
9 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material upto all leads & lifts as per direction of Engineer-in-charge :In cement mortar | 23.62 | cum | 1,412 | ₹33,351.44 |
| 2 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material up to all leads & lifts as per direction of Engineer - in - charge. G.S. Sheet | 118.8 | Sqm | 75.8 | ₹9,005.04 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material up to all leads & lifts as per direction of Engineer - in - charge. | 2.34 | cum | 1,367.9 | ₹3,200.89 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, upto all leads & lifts as directed by the Engineer-in- charge. (a) All kinds of soil. | 39.3 | cum | 238.7 | ₹9,380.91 |
| 5 | Providing and laying hand packed stone filling under floors including watering, ramming, consolidating and dressing complete including carriage of material in all lead & lifts. | 7.02 | cum | 1,478.2 | ₹10,376.96 |
| 6 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level including carriage of material in all leads and lifts. | 4.68 | cum | 6,758.6 | ₹31,630.25 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). | 3.44 | cum | 9,800.2 | ₹33,712.69 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including carriage of material in all leads and lifts. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 412.8 | Kg | 104.1 | ₹42,972.48 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for including carriage of material in all leads and lifts. a)Lintels, beams, plinth beams, girders, bressumers and cantilevers | 47.16 | Sqm | 459.3 | ₹21,660.59 |
| 10 | Random rubble masonry/polygonal rubble masonry uncoursed/brought to courses) with hard stones of approved quality in foundation and plinth including levelling up- with cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 20 mm nominal size) at plinth level in cement mortar 1:6(1 cement: 6 sand) including carriage of material in all leads and lifts. | 18.2 | cum | 6,375.7 | ₹1,16,037.74 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
Dharf68.pdf
Tender Documents • 2.14 MB
BOQ_212343.xls
BOQ • 0.32 MB
UNDERTAKINGTender.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .