Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | ₹2.4 L | L1 | Accepted-AOC accecpted |
| 2 | L2₹2.4 L+₹354 (0.15%)Rejected-Finance | ₹2.4 L+₹354 (0.15%) | L2 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | T.G.RAJU L2 | SAKTHI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 44 | m3 | 186 ₹8,184 | 184 ₹8,096 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 8 | m3 | 5,132 ₹41,056 | 5,130 ₹41,040 Lowest |
| 3.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
SIDE | 144 | m3 | 460 ₹66,240 | 459 ₹66,096 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 17 | m3 | 6,582 ₹1,11,894 | 6,580 ₹1,11,860 Lowest |
| 5.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 36 | m2 | 269 ₹9,684 | 267 ₹9,612 Lowest |
Tender Value
₹2.9 L
EMD Value
₹2,900
Closing Date
7 Oct 2025, 3:00 pmClosed
EO Kaveripattinam TP
Palacode Main road Kaveripattinam Post Krishnagiri District
Construction of Drain at Ward no.13 Shunmugachetty Street in Kaveripattinam Town Panchayat
2025_DTP_610995_1
483/2025/HC General Fund
Open Tender
Civil Works
Works
Kaveripattinam TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,900
Yes
31 Oct 2025
3 Oct 2025
7 Oct 2025
3 Oct 2025
7 Oct 2025
3 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .