| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-Finance NONAKURI KANKTIA P O NONAKURI BAZAR PURBA MEDINIPUR | PURBA MEDINIPUR | WEST BENGAL | 1 | Accepted-Finance accept | |
| 2 | 2₹3.5 L+₹1.9 L (114.1%)Accepted-Finance VILL SIMULIA PO BHIMESWARI BAZAR PS BHAGWANPUR DIST PURBA MEDINIPUR WEST BENGAL | PURBA MEDINIPUR | WEST BENGAL | 2 | Accepted-Finance accept | |
| 3 | 3₹4.6 L+₹2.9 L (179.9%)Accepted-Finance | 3 | Accepted-Finance Accept |
Tender Value
₹4.6 L
Closing Date
18 Apr 2024, 3:00 pmClosed
SUB-DIVISIONAL OFFICER, EGRA
O/o the SDO, Egra
Electrical Lighting, Sound System, etc Arrangements and Construction of Pandel at Egra JL HS
2024_DMPM_688266_1
CE-NIT No.01 (2nd Call/PGE-2024 of 2024-25
Open Tender
Miscellaneous Works
Item Rate
2 days
JHATULAL HIGH SCHOOL, EGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
6 Jun 2024
15 Apr 2024
20 Apr 2024
15 Apr 2024
18 Apr 2024
15 Apr 2024
Hirecharges of Electrical fittings & goods, fitted & fixed in position complete in all respect and removed all after the completion of election work as per direction of authority. All materials are to be supplied at places mentioned above.
Tube-Light long for one day
Bulbs-100 watts for one day
Bulbs-200 watts for one day
Table Fan for one day
Celling Fan for one day
Pedestal Fan for one day
Halogen-1000 watts for one day
Mercury light-400 watts for one day
Metal Lamp-400 watts for one day
Microphone set with one Box for one day
Microphone set with two Box for one day
Microphone set with two horns for one day
Microphone set with three horns for one day
32" colour T.V. LED for one day
Emergency light for one day
15 amp. Plug Point for one day
5 amp. Plug Point for one day
22 watts LED Bulbs for one day
Audio Cable (Extension male to male) for one day
Hirecharges of Electrical fittings & goods, fitted & fixed in position complete in all respect and removed all after the completion of election work as per direction of authority. All materials are to be supplied at places mentioned above.
Tube-Light long for two day
Bulbs-100 watts for two day
Bulbs-200 watts for two day
Table Fan for two day
Celling Fan for two day
Pedestal Fan for two day
Halogen-1000 watts for two day
Mercury light-400 watts for two day
Metal Lamp-400 watts for two day
Microphone set with two horns for two day
Microphone set with three horns for two day
Microphone set with one box for two day
Microphone set with two box for two day
32" colour T.V. LED for two day
Emergency light for two day
15 amp. Plug Point for two day
5 amp. Plug Point for two day
22 watts LED Bulbs for two day
Audio Cable (Extension male to male) for two day
Hirecharges of Electrical fittings & goods, fitted & fixed in position complete in all respect and removed all after the completion of election work as per direction of authority. All materials are to be supplied at places mentioned above.
Tube-Light long for three day
Bulbs-100 watts for three day
Bulbs-200 watts for three day
Table Fan for three day
Celling Fan for three day
Pedestal Fan for three day
Halogen-1000 watts for three day
Mercury light-400 watts for three day
Metal Lamp-400 watts for three day
Microphone set with two horns for three day
Microphone set with three horns for three day
Microphone set with one box for three day
Microphone set with two box for three day
32" colour T.V. LED for three day
Emergency light for three day
15 amp. Plug Point for three day
5 amp. Plug Point for three day
22 watts LED Bulbs for three day
Audio Cable (Extension male to male) for three day
Hirecharges of Electrical fittings & goods, fitted & fixed in position complete in all respect and removed all after the completion of election work as per direction of authority. All materials are to be supplied at places mentioned above.
Tube-Light long for 4(four) days
Bulbs-100 watts for 4(four) days
Bulbs-200 watts for 4(four) days
Talbe Fan for 4(four) days
Celling Fan for 4(four) days
Pedestal Fan for 4(four) days
Halogen-1000 watts for 4(four) days
Mercury light-400 watts for 4(four) days
Metal Lamp-400 watts for 4(four) days
Microphone set with two horns for 4(four) days
Microphone set with three horns for 4(four) days
Microphone set with one box for 4(four) days
Microphone set with two box for 4(four) days
32" colour T.V. LED for 4(four) days
Emergency light for 4(four) days
15 amp. Plug Point for 4(four) days
5 amp. Plug Point for 4(four) days
22 watts LED Bulbs for 4(four) days
Audio Cable (Extension male to male) for one day
Hirecharges of Electrical fittings & goods, fitted & fixed in position complete in all respect and removed all after the completion of election work as per direction of authority. All materials are to be supplied at places mentioned above.
Tube-Light long for 8 (eight) days.
Bulbs-100 watts for 8 (eight) day
Bulbs-200 watts for 8 (eight) day
Talbe Fan for 8 (eight) day
Celling Fan for 8 (eight) day
Pedestal Fan for 8 (eight) day
Halogen-1000 watts for 8 (eight) day
Mercury light-400 watts for 8 (eight) day
Metal Lamp-400 watts for 8 (eight) day
Microphone set with two horns for 8 (eight) day
Microphone set with three horns for 8 (eight)two day
Microphone set with one box for 8 (eight) day
Microphone set with two box for 8 (eight)two day
32" colour T.V. LED for 8 (eight) day
Emergency light for 8 (eight) day
15 amp. Plug Point for 8 (eight) day
5 amp. Plug Point for 8 (eight) day
22 watts LED Bulbs for 8 (eight) day
Audio Cable (Extension male to male) for two day
Hirecharges of Electrical fittings & goods, fitted & fixed in position complete in all respect and removed all after the completion of election work as per direction of authority. All materials are to be supplied at places mentioned above.
Tube-Light long for Additional one day
Bulbs-100 watts for Additional one day
Bulbs-200 watts for Additional one day
Talbe Fan for Additional one day
Celling Fan for Additional one day
Pedestal Fan for Additional one day
Halogen-1000 watts for Additional one day
Mercury light-400 watts for Additional one day
Metal Lamp-400 watts for Additional one day
Microphone set with two horns for Additional one day
Microphone set with three horns for Additional one day
Microphone set with one box for Additional one day
Microphone set with two box for Additional one day
32" colour T.V. LED for Additional one day
Emergency light for Additional one day
15 amp. Plug Point for Additional one day
5 amp. Plug Point for Additional one day
22 watts LED Bulbs for Additional one day
Audio Cable (Extension male to male) for Additional one day
Hirecharges of Generator set of 7.5 KVA fitted 7 dixed in position complete in all respect and removed all after the completion of election of election work as per direction of authority. All materials are to be supplied at places mentioned above (Dry rate)
1 (one) days
3( three) days
7 (Seven) days
15 (fifteen) days
1 (one) Month
Running cost of Generator for 7.5 KVA including fueling including all complete for each set
For 1(one) hour
Hire charges of sound less Generator set of 62 KVP (Three Phase) fitted & fixed in position complete in all respect and removed all after the completion of election work as per direction of authority. All materials are to be supplied at places mentioned above (Dry Rate) per day
1(One) day
3( three) days
7 (Seven) days
15 (fifteen) days
1 (one) Month
Running cost of Generator for sound less Generor set of 62 KVA including fueling including all complete for each set
For 1(one) hour
Hiring charge of 500V, 100Amp, TPN Main Swich fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 500V, 100Amp, Charge over Swich fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 500V, 63Amp, TPN Main Swich fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 50 sqmm PVC cable fitted & fixed in position complete in all respect and removed all after the completion of election for one day
Hiring charge of 35 sqmm PVC cable fitted & fixed in position complete in all respect and removed all after the completion of election for one day
Hiring charge of 25 sqmm PVC cable fitted & fixed in position complete in all respect and removed all after the completion of election for one day
Hiring charge of 60-100Amp, TPN DB with 4 bars fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 1.5-2 Ton Air Condition Machine of ISI Mark fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of Microphone set/PA System with ten horns for one day
Hiring charge of Cord-less Microphone set for one day
Hiring charge of 32" Coloured LED TV set of ISI Mark fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 40" Coloured LED TV set of ISI Mark fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 43" Coloured LED TV set of ISI Mark fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 120 Ltr. Water Cooler set of ISI Mark fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 190 Ltr. Deep Freez set of ISI Mark fitted & fixed in position complete in all respect and removed all after the completion of election for one month
Hiring charge of 1000 Watts Inveter set for uninterupter connection of CC TV of ISI Mark fitted & fixed in position complete in all respect and removed all after the completion of election for one month.
Single slope strong bamboo (3" to 4") frame work shed with Tarpaulin cover height 8'-6" to 9'-0" at the end and the post of strong bamboo (4"dia) @ 6'-0" C/C and embedded sufficiently in the ground supplied fited fixed with coir rope eith refits runners, ties, stiffeners and crossing etc, of full bamboos runner to be fixed with pillar or posts at protection of work Nylon/Coir rope and half split or full bamboo to be fixed on the roof of the shed to above the wind blow. The covering must sun/rain water tight, leakage of rain water will not be allowed in any circumstances. The ground to be labeled and dressed before starting the work, to be completed as per directions of the authority.
Without side covering for 3(Three) days.
One side covering for 3(Three) days.
Two side covering for 3(Three) days.
Three sive covering for 3(Three) days.
Four side covering for 3(Three) days.
vAdditional hiring charge for without side covering for 1(one) day
vAdditional hiring charge for one side covering for 1(one) day
vAdditional hiring charge for Two side covering for 1(one) day
ix) Additional hiring charge for Three side covering for 1(one) day
x) Additional hiring charge for Four side covering for 1(one) day
Double slope bamboo frame work shed including alternative UC bullah post ( 6")with Tarpaulin cover & other fittings same as item no. 1 above
Without side covering for 3(Three) days.
One side covering for 3(Three) days.
Two side covering for3(Three) days.
Three sive covering for 3(Three) days.
Four side covering for 3(Three) days.
vAdditional hiring charge for without side covering for 1(one) day
vAdditional hiring charge for one side covering for 1(one) day
vAdditional hiring charge for Two side covering for 1(one) day
ix) Additional hiring charge for Three side covering for 1(one) day
x) Additional hiring charge for Four side covering for 1(one) day
Flat roof shed covered with Hessian as will be required as per direction of the authority, fitting same as item no. 1.
Hessian Covering-3(Three) days.
Additional hiring charge for 1(one) day for above mentioned item.
Tarpaulin/Hessian Sheet/Cloth partition strongly fixed on the bamboo frame (high 8'-0" to 9'-0") completed as per direction of the authority.
Tarpaulin Covering-3(Three) days.
Hessian Covering-3(Three) days.
Cloth (good quality)- 3(Three) days.
Additional hiring charge for Tarpaulin covering for 1(one) day
Additional hiring charge for Hessian covering for 1(one) day
vAdditional hiring charge for Cloth(good quality) covering for 1(one) day
Flat roof Pandel covered with coloured cloth as will be required as per direction of the authority, fitting same as item no. 1.
Without side covering for 3(Three) days.
One side covering for 3(Three) days.
Two side covering for 3(Three) days.
Three sive covering for 3(Three) days.
Four side covering for 3(Three) days.
vAdditional hiring charge for without side covering for 1(one) day
vAdditional hiring charge for one side covering for 1(one) day
vAdditional hiring charge for Two side covering for 1(one) day
ix) Additional hiring charge for Three side covering for 1(one) day
x) Additional hiring charge for Four side covering for 1(one) day
Flat roof ceiling work covered with new coloured cloth as will be required as per direction of the authority including raping up coloured cloth cover bamboo post including all complete but excluding the supporting frame work.
For 3(Three) days
Additional hiring charge for 1(one) day
Corrugated sheet partition strongly fixed on the floor(height 8' to 9') including frame work & complete as per direction of the authority. Fittings same as item no.1
For 3(three) days
Additional hiring charge for 1(one) day
Bamboo (4" dia) frame work inside the room for making partition with strong Bamboo posts (4"dia) 6'-0" apart and strongly fixed on the floor with runner etc. complete as per direction. Fittings same as item No.1 for three days
Bamboo (4" dia) fencing 1'-0" apart vertically in 3 rows supplied & fixed with strong bamboo posts where necessary within the pandel to construct where necessary as per direction.
For 3(three) days
Additional hiring charge for 1(one) day
Barbed wire/Bamboo fencing 1'-0" apart vertically in 4 rows supplied & fixed with strong bamboo post(4"dia) @ 6'-0" apart and strongly embedded into the ground and to construct where necessary as per direction.
i)Barbed wire for 3(three) days
ii)Bamboo for 3(three) days
Additional hiring charge for barbed wire for 1(one) day
Additional hiring charge for bamboo for 1(one) day
Trench Latrine 3'6"×3'0" size (Trench 3'0" depth 1'6" width) with full Bamboo platform 1'3" width and Hessian partitions on the three side and a Hessian screen at front side Height of latrine 4'6" Posts & runner of full bamboo 3'0"dia the trenchers to be filled with earth and removed after completetion of the Election work as per direction.
Trench Urinal 3'0"×2'0" size ( 1'6" depth & 1'6" width trench. With a kancha drain 16"×1'0" and a sock pit 3'0" dia excavated earth after completetion of the Election work as per direction.
Iron neting/Chicken mesh work to the windowa including supplying, fitting & fixing with 1"×1 batten for window complete & remove the same after completion of the election work.
For 12( twelve )days
Additional hiring charge for 1(one) day
Iron neting/Chicken mesh work in sidef of the room, supplying, fitting & fixing all materials complete & remove the same after completion of the election work for Two days
Hard wood Z-batten work with 2'×2" pattern to doors & windows with necessary nail to seal the shutter complete & remove the same after completion of Election work (Materials are returnable after the fork.
For 12( twelve )days
Additional hiring charge for 1(one) day
Corrugated/Plain sheer or 1" thick hard wood plank work to doors & window with 2'×2 batten & fitted with 'J' or 'U' hook to seal the shutter from insidef & out side complete & remove the same after completion of the election work.
Corrugated/Plain Sheet for 12(Twelve) days
1" thick hard wood for 12(twelve) days
Corrugated.Plain Sheet for additional hiring charge for 1(one)day
1" thick hard wood for additional hiring charge for 1(one)day
Corrugagted or plain sheet work with 1"thick hard wood plank work to door & window with 2'×2" hard wood batten, filled & fixed with 'J' or 'U' hook/Iron wear/nail/etc. seal the shutter from inside & outside complete & removed of the same after completion of work.
For 12( twelve )days
Additional hiring charge for 1(one) day
Hiring charges of chairs for election work. The chairs are to be supplied at places mentioned above (Please specify type/quality of chair)
for one day
for two days
for three days
for five days
for twelve days
Hiring charges of table of size 4'-0"×2'-6" for election work. The tables are to be supplied at places mentioned above (Please specify type/quality of chair)
for one day
for two days
for three days
for five days
for twelve days
Hiring charges of table of size 3'-0"×3'-0" for election work. The tables are to be supplied at places mentioned above for one day. (Please specify type/quality of chair)
Hiring charges of good quality table cloth of size 6'-0"×4'0" for election work. The tables are to be supplied at places mentioned above for one day.
Hiring charges of good quality sofa set for election work. The sets are to be supplied at places mentioned above (Please supply photo)
for one day
for two days
for three days
Hiring charges of good quality centre table for election work. The tables are to be supplied at places mentioned above. (Please supply photo)
for one day
for two days
for three days
Supplying and placing cartoon for dustbin for three days
Construction of drop gate with bamboo(4"dia) fitting fising complete & removed after completion of the election work for three days
Hire charges collapsible bate, supplying, fitting fixing complete including all charges.
for one day
for two days
for three days
for twelve days
Supplying fitting fixing iron door ring
Hire charges of water drum(200ltr.) for one day
Hire charges of water drum(1000ltr.) for one day
Hire charges of wooden platform for cover drain complete for three day
Hire charges of GI/Ori-plust pipe of 12to25mm dia including fitting & fixing by necessary bends, bracket etc. and removing same after completion of the election work as per direction for three day
Hire charges of GI/ Plastic bib cock including fitting & fixing by necessary bends, bracket etc. and removing same after completion of the election work as per direction for three day
Erection & hiring charges of wooden Rack/Platform by wooden plank or ply wood work excluding supporting frame work as per direction.
for three day
for twelve days
Additional hiring charge for 1(one) day
Erection & hiring charges of wooden Rack/Platform by wooden plank or ply wood work excluding supporting frame work as per direction.
for three day
for twelve days
Additional hiring charge for 1(one) day
Batten framing with cloth for screen board & other fitting
For one days
For two days
for three days
Hire charges for good quality for folding bed
For one days
For two days
for three days
For four days
Hire charges for good quality for mattress, pollow, bed cover (one set)
For one days
For two days
for three days
For Twelve days
Repairing of wooden door and window by Replacing the necessary ( Batten complete)
For one days
For seven days
For twelve days
Polythene paper of satranchi for grass floor sitting
For one days
For two days
For three days
Making of wooden platform (6"' to 1' hight) and necessary frame work for grass floor sitting
For one days
For two days
for three days
for twelve days
Good quality latrine pane and side wall hogla or black polythin covering with all fitting
Good quality uniral pane and side wall hogla or black polythin covering with all fitting
(5"' inch.) Brick cement wall work for window and door sealing and removing same after completion of the election work as per direction
Hire charges of VIP Cushioned Chair, Supplying fitting fixing complete including all charfges.
for one day
for two days
for three days
Hire charges of Carpet (Best Quality), Supplying, fitting, fixing complete including all charges for 3(Three) days
7(Seven)
15 (Fifteen)
1 (one) Month
Hire charges of Steel Almirah of 7"-0" height, Supplying, fitting, fixing complete including all charges for one Month
Supplying fitting fixing of wooden structure made of local wood (50×50 or 75×75 batten) as per approved design & direction for wooded Rack/Platform including necessary hinge, nail etc and removing dame after completion of the election work as per direction including hiring charges. (Measurement will be made over finished volume of wood work only)
Supplying fitting fixing of structure for Tower made of Eucalyptus bullah as vertical post and strong bamboo tie of size 10'×10' in base and at least 30' height as per approved design & direction including necessary hinge, nail etc and removing same after completion of the election work as per direction including hiring charges for one Month
Hiring Charges for VIP chair cover
1) one day
2) Two day
3) Three day
Hiring charges for sofa cover
1) one day
2) Two day
3) Three day
Hiring charges plastic chair cover
1) One day
2) Two day
3) Three day
Plastic table cover
1) One day
2) Two day
3) Twelve day
Supply of Fine sand for election work
Supply of Bag for sand filling
Plywood partition as required for Election Work.
1) One day
2) Two day
3) Twelve day
PARBATTI DECORATOR
NEW MAA SITALA DECORATORS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .