Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.2 LAccepted-AOC | ₹15.2 L | L-1 | Accepted-AOC Lowest |
| 2 | L-2₹15.8 LRejected-Finance ANAND NAGAR PERI PURE SHIV BAKHTAWAR GONDA | ₹15.8 L | L-2 | Rejected-Finance II |
| 3 | L-3₹16.3 LRejected-Finance MOHANLALGANJ LUCKNOW UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | ₹16.3 L | L-3 | Rejected-Finance III |
| 4 | L-4₹16.6 LRejected-Finance 21 SARSWATIPURAM KHARGAPUR GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹16.6 L | L-4 | Rejected-Finance IV |
| 5 | L-5₹16.7 LRejected-Finance | ₹16.7 L | L-5 | Rejected-Finance V |
| Sl No | Description | Qty | Unit | Ram Asrey L1 | M/S MAA SHREE CONSTRUCTION L5 | VINAYAK INFRA L6 | M/S J.M.V. CONSTRUCTION L2 | M/s RATHAUR CONSTRUCTION L4 | m/s mohd. zamil L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing brick work manually/by mechanical means including stacking of servicable material and disposal of unservicable material within 50 meters lead as per direction of Engineer in charge i/c all labour and T&P etc for proper completion of work. | 2.5 | M³ | 980 ₹2,450 | 850 ₹2,125 | 884.8 ₹2,212 | 781.49 ₹1,953.73 | 700 ₹1,750 | 806.06 ₹2,015.15 |
| 2.00 | 1st class brick work with 1:4 cement sand mortar including all cost of material,labour and T&P etc. required for proper completion of work. | 57.81 | M³ | 6,820 ₹3.9 L | 6,000 ₹3.5 L | 6,236.62 ₹3.6 L | 5,550.69 ₹3.2 L | 6,300 ₹3.6 L | 5,725 ₹3.3 L |
| 3.00 | Centering and shuttering for R.C.C. work including rent of shuttering ,Material,Labour and T&P required for proper completion of work | 14.68 | M2 | 990 ₹14,533.20 | 850 ₹12,478 | 894.34 ₹13,128.91 | 789.44 ₹11,588.98 | 500 ₹7,340 | 814 ₹11,949.52 |
| 4.00 | Providing cutting, bending binding & placing in position for steel reinforcement in R.C.C. work including cost of all Material,Labour and T&P required for proper completion of work | 0.57 | MT | 94,600 ₹53,922 | 94,000 ₹53,580 | 85,155.04 ₹48,538.37 | 75,211.77 ₹42,870.71 | 70,000 ₹39,900 | 77,576.5 ₹44,218.61 |
| 5.00 | Laying of R.C.C. 1:1½:3 with kabrai grit 10-20 mm size and coarse sand including cost of all materials,labour T&p etc upto proper completion of work. | 2.87 | M³ | 8,700 ₹24,969 | 8,500 ₹24,395 | 7,921.78 ₹22,735.51 | 6,996.8 ₹20,080.82 | 8,100 ₹23,247 | 7,216.2 ₹20,710.49 |
| 6.00 | Providing & fixing corrugated G.S sheet roofing including vertical /curved surface fixed with polymer coated J or L hooks,bolt and nut 8 mm diameter with bitumen and GI limpet washers or with G.I limpet washer filled with white lead ,i/c a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/vertical or curved surface) excluding the cost of purlin ,rafters and trusses and including cutting to size and shape wherever required at absent places of G.S sheets roofing including of all labour ,material and T&P etc upto proper completion of work. | 38.4 | M2 | 1,140 ₹43,776 | 1,000 ₹38,400 | 1,031.49 ₹39,609.22 | 910.28 ₹34,954.75 | 1,250 ₹48,000 | 938.91 ₹36,054.14 |
| 7.00 | Providing and Fixing 1mm thick M.S. Sheet door with Frame of 40x40x6 mm angle iron and 3mm M.S. gusset plates at the junctions and corners all necessary fittings complete including applying a priming coat of approved steel Primer including of all labour ,material and T&P etc upto proper completion of work. | 11.88 | M2 | 4,510 ₹53,578.80 | 4,500 ₹53,460 | 4,108.8 ₹48,812.54 | 3,628.38 ₹43,105.15 | 3,800 ₹45,144 | 3,742.5 ₹44,460.90 |
| 8.00 | Laying of C.C. 1:3:6 with kabrai grit 10-20 mm size and coarse sand including cost of all materials,labour T&p etc upto proper completion of work. | 13.2 | M³ | 8,010 ₹1.1 L | 8,000 ₹1.1 L | 7,239.59 ₹95,562.59 | 6,398.96 ₹84,466.27 | 5,900 ₹77,880 | 6,600.01 ₹87,120.13 |
| 9.00 | Laying of 40mm thick in 1:2:4 C.C flooring over 40mm thick in 1:4:8 cement concrete base in cement ,coarse sand and 10-20 mm stone grit including cost of all materials,labour and T&p etc upto proper completion of work. | 49.1 | M2 | 1,050 ₹51,555 | 1,010 ₹49,591 | 968.2 ₹47,538.62 | 854.63 ₹41,962.33 | 700 ₹34,370 | 881.5 ₹43,281.65 |
| 10.00 | Cement plaster in 1:4 cement mortar ,cement coarse sand including cost of all material labour and t&p etc upto proper completion of work. | 344 | M2 | 240 ₹82,560 | 220 ₹75,680 | 218.18 ₹75,053.92 | 192.39 ₹66,182.16 | 150 ₹51,600 | 198.43 ₹68,259.92 |
Tender Value
₹19.8 L
EMD Value
₹39,680
Closing Date
10 Feb 2026, 11:00 amClosed
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER L.D-2,.S.C
Rejuvenation work of Barrel No 09 at km 0.300 of Right kukrail Bund
2026_UPIDC_1111865_1
06/EE/2025-26
Open Tender
Civil Works - Buildings
90 days
Lucknow
Refer tender Document
3 documents required · 3 mandatory
₹854
₹39,680
Yes
24 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
Demolishing brick work manually/by mechanical means including stacking of servicable material and disposal of unservicable material within 50 meters lead as per direction of Engineer in charge i/c all labour and T&P etc for proper completion of work.
1st class brick work with 1:4 cement sand mortar including all cost of material,labour and T&P etc. required for proper completion of work.
Centering and shuttering for R.C.C. work including rent of shuttering ,Material,Labour and T&P required for proper completion of work
Providing cutting, bending binding & placing in position for steel reinforcement in R.C.C. work including cost of all Material,Labour and T&P required for proper completion of work
Laying of R.C.C. 1:1½:3 with kabrai grit 10-20 mm size and coarse sand including cost of all materials,labour T&p etc upto proper completion of work.
Providing & fixing corrugated G.S sheet roofing including vertical /curved surface fixed with polymer coated J or L hooks,bolt and nut 8 mm diameter with bitumen and GI limpet washers or with G.I limpet washer filled with white lead ,i/c a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/vertical or curved surface) excluding the cost of purlin ,rafters and trusses and including cutting to size and shape wherever required at absent places of G.S sheets roofing including of all labour ,material and T&P etc upto proper completion of work.
Providing and Fixing 1mm thick M.S. Sheet door with Frame of 40x40x6 mm angle iron and 3mm M.S. gusset plates at the junctions and corners all necessary fittings complete including applying a priming coat of approved steel Primer including of all labour ,material and T&P etc upto proper completion of work.
Laying of C.C. 1:3:6 with kabrai grit 10-20 mm size and coarse sand including cost of all materials,labour T&p etc upto proper completion of work.
Laying of 40mm thick in 1:2:4 C.C flooring over 40mm thick in 1:4:8 cement concrete base in cement ,coarse sand and 10-20 mm stone grit including cost of all materials,labour and T&p etc upto proper completion of work.
Cement plaster in 1:4 cement mortar ,cement coarse sand including cost of all material labour and t&p etc upto proper completion of work.
Painting One priming coat and two coat oil distemper on new work including cost of all material ,labour and T&P etc upto proper completion of work.
Providing and fixing Structural steel work in single section ,fixed with or without connection plate including cutting ,hoisting ,fixing in position and applying a priming coat of approved steel primer all complete as per site conditions & directions of Engineer in charge including cost of all material ,labour and T&P etc upto proper completion of work.
Providing and fixing steel work in built up tubular (round,square or rectangular hollow tubes etc.) trusses etc., including cutting ,hoisting,fixing in position and applying a priming coat of approved steel primer ,including welding and bolted with special shaped washers etc complete as per site conditions & directions of Engineer in charge including cost of all material ,labour and T&P etc upto proper completion of work.
Providing and fixing Steel work welded in built up section /framed work ,including cutting ,hoisting ,fixing in position and applying a priming coat of approved steel primer using structural steel etc in stringers,treads,landings etc. of stair cases, including use of chequered plate wherever required all complete as per site conditions & directions of Engineer in charge including cost of all material ,labour and T&P etc upto proper completion of work.
Painting Steel work with deluxe multi surface paint to given an even shade .two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture as per site conditions & directions of Engineer in charge including cost of all material ,labour and T&P etc upto proper completion of work.
Earthwork in filling arround barrels and stores including proper manual compaction & proper dressing to maintain stability of the structure and of all lead and lift and of all labour and T&P up to proper completion of work.
Brick on Edge Soling including preparation of subgrade at approaches as per directions of Engineer in charge of all material ,labour and T&P etc upto proper completion of work.
Painting Gauge on Barrel including cost of all material labour and t&p etc upto proper completion of work.
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/ GI structure of suitable strength with following components complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
Tendernotice_2.pdf
PDF • 1.35 MB
BOQ_2055739.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid