Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
10 Apr 2023, 3:00 pmClosed
Block Development Officer
BLOCK DEVELOPMENT OFFICE,KUMBAKONAM
Strengthening of Aghraharam Mela Theru at Kadichambadi Panchayat
2023_RDTN_299056_1
1625/2022/A2
Open Tender
Civil Works - Roads
Item Rate
365 days
Kadichambadi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,500
Yes
21 Apr 2023
1 Apr 2023
10 Apr 2023
1 Apr 2023
10 Apr 2023
1 Apr 2023
Amount
Part.01.Strengthening of Aghraharam Mela Theru at Kadichambadi Panchayat.
Earthwork Excavation
Earth work excavation and depositing on back with an initial of 10m and lift 2m in sand, silt or other loose soil, wet sand or silt not under water, light black cottonsoil, sandy loam and ordinary soil including excavated earth etc., as per SS 20 B including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content as determined in occurence with IS 2720(Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete as per MOST 301 - 305.
Picking
Picking The Existing Worn out For Picking WBM / BT Surface using 50 MM to 100 MM Depth including Cost & Conveyance including all ( One Third )
WBM Grade III
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method)
TACK COAT - 4Kg
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges
PREMIX CARPET WITH SEAL COAT TYPE ' A ' ( PLASTIC WASTE )
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Gravel For Edge Packing
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Selva Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .