Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
18 Dec 2019, 12:00 pmClosed
EXECUTIVE ENGINEER
EE ETD-II PARESHAN BHAWAN NEAR AMAR UJALA PRESS AGRA
Overhauling of cooling fans of 63/40 MVA Transformers and other related works at 132 KV S/S Agra Cantt/ Bichpuri.
2019_UPTCL_410199_1
T-06/ETD-II/(A)/19-20
Open Tender
Electrical Works
Lump-sum
90 days
132 KV AGRA CANTT/BICHPURI AGRA
PLEASE REFER TENDER DOCUMENTS.
2 documents required · 2 mandatory
₹236
EXECUTIVE ENGINEER ETD-II AGRA
₹2,000
20 Jan 2020
4 Dec 2019
18 Dec 2019
4 Dec 2019
18 Dec 2019
4 Dec 2019
Overhauling of cooling fans of 63/40 MVA Transformers
General maintenance/servicing of heavy duty cooling fan of 63 MVA / 40 MVA Transformers having capacity 415V, 50Hz, 700rpm, 240 watt, 610 mm sweep The scope of work includes safe disconnection of clectrical wirings of fan, removing case guard of colling fan, dismantling of fan motor from main structure from radiator, cleaning, oiling/greasing/lubrication of bearings, replacement of defective bearing/bushes if required, replacement of worn-out contacts if required, proper alignment of rotor shaft & fan wheel, porper sealing, changing of connections leads etc. The work also includes refitting/reinstallation back on radiator structure, checking the performance of the fans after connecting the proper supply and starting/stopping of fans at desired setting and free from abnormal noise. All men, material, consumbles, T&P shall be provided by the contractor at his own cost.
omplete rewinding and servicing of 240 watt, 610 mm sweep, 700 rpm, 50Hz, 3 phase 415 Volt colling fans 63 MVA Transformers by removing the fans from foundatinof transformer. Dismantling of fans and rewinding of motor with fresh supper enamelled copper wire of standard gauge and drying properly after varnishing, replacement of worn out bearing 2 Nos. repairing of bearing housing turning of shaft and changing of connection leads, refitting of the fnas on the foundation and checking the performance of the fans after connecting the proper supply.
Checking of cooling fan wiring and replacement of damaged fans contractors and over load relays and testing of fans operation on load NOTE Overload relay and fan contractor will be provided by the department.
M/S ZED ELECTRICAL SOLUTIONS
S.S. TRANSMISSION AND CONSTRUCTION COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .