| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.0 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹48.1 L+₹58,795.85 (1.24%)Rejected-Finance AMLA TOLA DISTT KATIHAR BIHAR 854105 | KATIHAR | BIHAR | 854105 | L2 | Rejected-Finance Not lowest bidder | |
| 3 | L3₹49.8 L+₹2.3 L (4.83%)Rejected-Finance STALIN NAGAR PANIGHATA ROAD PO BAGDOGRA DIST DARJEELING WB | BAGDOGRA | DARJEELING | WEST BENGAL | 734422 | L3 | Rejected-Finance Not lowest bidder | |
| 4 | L4₹50.1 L+₹2.6 L (5.48%)Rejected-Finance 23 3 SWAMIJISARANI HAKIMPARA SILIGURI 734 001 | SILIGURI | DARJEELING | WEST BENGAL | 734001 | L4 | Rejected-Finance Not lowest bidder | |
| 5 | L5₹50.3 L+₹2.8 L (5.92%)Rejected-Finance | L5 | Rejected-Finance Not lowest bidder |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
19 Jul 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Bengdubi
Bengdubi Military Station, PO-Bengdubi, Dist-Darjeeling, Pin 734424
GE/BENG/18 OF 2021-22 REPAIR/MAINTENANCE OF CEILING/EXHAUST/ WALL MOUNTED FAN OTHER FAN AND MAIN PIPE LINE OF SHALLOOW WELL/JACKWELL STEEL TANK WITH ALLIED WORKS AT VARIOUS LOCATIONS UNDER AGE E/M OF GE BENGDUBI MIL STN
2021_MES_455554_1
GE/BENG/18 OF 2021-22
Open Tender
Civil Works
Works
180 days
Bengdubi
MES Enlisted/ Un-enlisted contractor of Class D and above with category b(i)
8 documents required · 8 mandatory
₹500
GE Bengdubi
₹94,000
Yes
1 Sept 2021
29 Jun 2021
22 Jul 2021
29 Jun 2021
19 Jul 2021
14 Jul 2021
1 Jul 2021 - 6 Jul 2021
60 days
Amount
SCHEDULE 'A'
Taking down and checking of ceiling fan / exhaust fan / wall any type and size at site on daily basis after disconnecting the electrical connection including replacement of unserviceable spares parts with new parts, lubricating with approved grade of grease and necessary minor work (if required) and refixing the fan in same position including all electrical connection all as directed. ii) New spare parts shall be measured and paid separately as ‘ Supply only’ under respective items of Sch 'A' / BoQ. iii) Labour cost for replacing spare parts are deemed to be inclusive in the quoted rate.
Taking down carefully ceiling fan any sweep and any make after disconnecting the electrical connection, dismantling the blades and removing fan incl blades to the work shop including cleaning and dismantling the fan into parts and segregation of unserviceable parts, replacement of unserviceable spares parts with new parts including necessary machining work and lubricating with approved grade of grease and necessary minor soldering work (if required) and re-assembling the fan complete and testing and refixing the fan in same position including all electrical connection and material and labour for replacement of two nos split pins, one connection block and one rubber reel all as specified and as directed. Note : i) Rewinding work of armature (if any) shall be measured and paid separately ii) New spare parts required for replacing old burn out parts other than connector, split pins, connection block and rubber reel shall be measured and paid separately under respective items of Sch 'A' / BoQ. iii) Labour cost for replacing spare parts are deemed to be inclusive in the quoted rate.
Material and labour for taking out and removing burnt copper winding, cleaning the armature, rewinding the fan armature for 1200mm sweep fan with new super enamelled copper wire of existing gauge including supply and fixing necessary insulating materials etc and varnishing with approved grade of insulation varnish and heating up and testing all as specified and as directed.
Ditto all as pr item No.59.00 here-in-before but for 1400mm sweep ceiling fan all as specified and as directed.
Taking down carefully existing exhaust fan of any size sweep and any make after disconnecting the electrical connection, and removing the exhaust fan with blade to the work shop including cleaning of dust and dismantling the fan into parts and segregation of unserviceable parts, replacement of unserviceable spares parts with new parts including necessary machining work and lubricating with approved grade of grease and necessary minor soldering work (if required) re-assembling the fan complete , testing and refixing the fan in same position including all electrical connection and material and labour for replacement of one connection block all as specified and as directed. Note : i) Rewinding work (if any) shall be measured and paid separately ii) New spare parts required for replacing old worn out parts other than connector, shall be measured and paid separately under respective items of Sch 'A' / BoQ. iii) Labour cost for replacing spare parts are deemed to be inclusive in the quoted rate.
Material and labour for taking out and removing burnt copper winding, cleaning the armature, rewinding the fan armature for upto 300 mm sweep exhust fan with new super enamelled copper wire of existing gauge including supply and fixing necessary insulating materials etc and varnishing with approved grade of insulation varnish and heating up and testing all as specified and as directed.
Ditto all as pr item No.62.00 here-in-before but for 450 mm sweep ceiling fan all as specified and as directed.
Material and labour for painting of ceiling fans complete of any sweep/make with one coat of first quality synthetic enamell paint of approved tint by spray including preparation of old painted surface and removing all dust, oil mark etc and filling cavaties with filler materials,and writing serial / MES number as specified (with paint of black colour with each letters/figures in Block of height n.exc2 cm ) complete all as specified and as directed.
Ditto all as pr item No.8.00 here-in-before but for painting to exhaust fans with blade complete of any sweep/make all as specified and as directed.
Supply only bearing No.6201/6202 for ceiling /Exhaust fan (Make - TATA / SKF/ NBC ).
Supply only bearing No.6203/6204 for ceiling/ Exhaust fan (Make - TATA / SKF/ NBC ).
Supply only fan condensor 3.15 mfd oil filled (Make - USHA / UNIVERSAL / Havells}.
Supply only fan condensor 3.15 mfd dry type (Make - USHA / UNIVERSAL /Havells}.
Supply only fan condensor 2.5 mfd oil filled (Make - USHA / UNIVERSAL / Havells).
Supply only fan condensor 2.5 mfd dry type (Make - USHA / UNIVERSAL / Havells).
S&F in replacement electronic fan regulator socket type (step 0-5) (Make - ANCHOR / HAVELLS / CROMPTON).
S&F in replacement electronic fan regulator switch type (step 0-5) (Make - ANCHOR / HAVELLS / CROMPTON).
S&F in replacement modular regulator step type 120 watt, 2 module complete all as specified and directed.
Supply only gun metal bush of any size (Make - TATA/MSP or Approved by GE).
Supply only mounting clamp assembly complete for ceiling fan 1200mm/1400mm sweep with amp,bolt,nut,washers, safety/ split pins and rubber bush and all as specified and directed.
Supply only down rod assembly complete for any type of ceiling fan all as specified and directed.
Supply and fixing in replacement louvers shutters aluminium based for Exhaust fan of any size up to 300 mm sweep suitable for any make and bolt, nut, washers etc complete including taking down old unserviceable one all as directed.
Supply and fixing in replacement louvers shutters aluminium based for Exhaust fan of any size above 300mm up to 450 mm sweep suitable for any make and bolt, nut, washers etc complete including taking down old unserviceable one all as directed.
Taking down carefully wall fan of any sweep and any make after disconnecting the electrical connection, dismantling the blades and removing fan incl blades to the work shop including cleaning and dismantling the fan into parts and segregation of unserviceable parts, replacement of unserviceable spares parts with new parts including necessary machining work and lubricating with approved grade of grease and necessary minor soldering work (if required) and re-assembling the fan complete and testing and refixing the fan in same position including all electrical connection. Note : i) Rewinding work (if any) shall be measured and paid separately ii) New spare parts required for replacing old worn out parts shall be measured and paid separately under respective items of Sch 'A' / BoQ. iii) Labour cost for replacing spare parts are deemed to be inclusive in the quoted rate.
Material and labour for taking out and removing burnt copper winding, cleaning the armature, rewinding the fan armature for wall fan of any size with new super enamelled copper wire of existing gauge including supply and fixing necessary insulating materials etc and varnishing with approved grade of insulation varnish and heating up and testing all as specified and as directed.
Material and labour for flexible multi stranded copper wire twin twisted two core of size 0.75 sqmm all as specified and as directed. (Make:Havells/Plaza/Polycab)
S&F aluminium based fan blade (set of three Nos) suitable for any type and any size with nut bolts complete all as directed.
Supply only ceiling fan canopy as per existing size (02 Nos ) complete all as directed.
S&F MS type hook suitable for any type and size of ceiling fan complete all as directed.
M&L for seven stage cleaning and sterilization inside the existing RCC Under Ground water well (Jackwell/Shallow well) of capacity 88000 gallon (Approx) size: Dia-6 Meter, Depth-15 Meter through bacteriological treatment by using TERBAC-G5, TERBAC-G65 or equivalent at pump house included suitable staging for lowering & installation of pump at any depth as required at site at all directed by Engr-in-Charge including Seven stage are as under:- (a) First stage is to drain out the water by using exit valve or our own high capacity dewatering system. (b) Second stage is cleaning all the algae formation inside the tank by using TERBAC G10 or equivalent a laboratory tested branded chemical of the company and scrubbing the walls of the tanks. (c) Third stage is scrubing the walls with mechanised scrubber & fresh water cleaning. (d) Fourth stage and first bacteria screening is Sterilization by using TERBAC-G5 or equivalent a Govt Laboratory certified branded halogen compound, test certificate of TERBAC-G5 or equivalent from PHED or Authorised laboratory mentioning suitability for sterilization should be submitted to the office before using for sterilization. (e) Fifth stage is cleaning the floor of the water tank. (f) Sixth Stage of cleaning and third bacteria screening is to sterilize the floor of the water well by using laboratory certified branded strong oxidizing agent TERBAC- G65 or equivalent.Test certificate of Terbac- G65 or equivalent From PHED or Authorised Laboratory mentioning suitability for sterilization should be submitted to the office before using for Sterilization.
Item no.30.00 contd.../- (g) A Sticker of appropriate size & colour as directed by Engineer-in-Charge and non degradable material with printed details as under:- (h) CA No (ii) Name of Applicant (iii) Name of Contractor (iv) Coloumn for date of Cleaning & Expiry date will be written or printed on sticker by permanent marking ink. (j) Painting of angle iron ladder for OHT after scrapping of old paint by emory paper or any other means with two coat of enamelled black paint over a coat of red oxide primer including arrangement of scrap folding/ bamboo structure required for entire works. NOTE:- (1) CONTRACTOR WILL SUBMIT GOVERNMENT LABORATORY TEST CERTIFICATE OF TERBAC-G5, TERBAC-G65 AND ALSO PROVIDE CERTIFICATE CONFIRMING THE COMPLETION OF STERILIZATION OF WATER WELLS MENTIONING THE NAME OF STATION AND DATE OF CLEANING. (2) ) ALL THE SAFTY EQUIPEMENTS AND NECESSARY INSURANCE FOR SAFTY OF WORKER TO EXECUTE THE WORK IS RESPONSIBILITY OF THE CONTRACTOR.
M & L for seven stage cleaning and sterilization inside the existing RCC overhead water tank of capacity 75000 gallon through bacteriological treatment by using TERBAC-G5, TERBAC-G65 or equivalent at pump house at any height (as per site requirement) all directed by Engr-in-Charge including stagig Seven stage are as under:- (a) First stage is to drain out the water by using exit valve or our own high capacity dewatering system. (b) Second stage is cleaning all the algae formation inside the tank by using TERBAC G10 or equivalent a laboratory tested branded chemical of the company and scrubbing the walls of the tanks. (c) Third stage is fresh water cleaning. (d) Fourth stage and first bacteria screening is Sterilization by using TERBAC-G5 or equivalenta Laboratory certified branded halogen compound, test certificate of TERBAC-G5 or equivalent from PHED or Authorised Laboratory mentioning suitability for sterilization should be submitted to the office before using for sterilization. (e) Fifth stage is cleaning the floor of the water tank. (f) Sixth Stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified branded strong oxidizing agent TERBAC- G65 or equivalent. Test certificate of Terbac- G65 or equivalent From PHED or Authorised Laboratory mentioning suitability for sterilization should be submitted to the office before using for Sterilization.
Item no.32.00 contd.../- (g) Cleaning of External surfaces, lid wall of tank, structure for all scales and other particle any algae, hives and any type of vegetation or any other unwanted matters, scraping of old paint and painting with two coats of cement based water proof apex paint complete all asdirected. (h) A Sticker of appropriate size & colour as directed by Engineer-in-Charge and non degradable material with printed details as under:- (i) CA No (ii) Name of Applicant (iii) Name of Contractor (iv) Coloumn for date of Cleaning & Expiry date will be written or printed on sticker by permanent marking ink. (j) Painting of angle iron ladder for OHT after scrapping of old paint by emory paper or any other means with two coat of enamelled black paint over a coat of red oxide primer including arrangement of scrap folding/ bamboo structure required for entire works. (k) Painting of raising main, distribution, wash out and overflow pipe on OHT with suitable colour coding. NOTE:- (1) CONTRACTOR WILL SUBMIT GOVERNMENT LABORATORY TEST CERTIFICATE OF TERBAC-G5, TERBAC-G65 or equivalent AND ALSO PROVIDE CERTIFICATE CONFIRMING THE COMPLETION OF STERILIZATION OF WATER TANKS MENTIONING THE NAME OF STATION AND DATE OF CLEANING. (2) ) ALL THE SAFTY EQUIPEMENTS AND NECESSARY INSURANCE FOR SAFTY OF WORKER TO EXECUTE THE WORK IS RESPONSIBLE OF THE CONTRACTOR.
All as per item No 2 here-in-before but overhead tank capacity 50,000 gallons all as directed.
S & F 63MM, 3-Inch Gun metal Brass Single headed Fire Hydrant volve ISI Mark all as per Specified and directed.
Taking down CI pipes 80 mm dia, Checking, cleaning internally by using steel brush /scrubber throughly to remove all rusts/slit/mud etc from pipe and Keep the Serviceable pipes & Lead in safe custody for refixing in existing/new position including replacing worn out Sockets, nuts, bolts, flange, gasket complete all as directed.
Ditto all as pr item No.36.00 here-in-before but for 100 mm dia.
Ditto all as pr item No.36.00 here-in-before but for 150 mm dia.
Ditto all as pr item No.36.00 here-in-before but for 200 mm dia.
Ditto all as pr item No.36.00 here-in-before but for 250 mm dia.
Ditto all as pr item No.36.00 here-in-before but for 300 mm dia.
Labour only for refixing CI Pipes any type 80 mm Bore with fittings fixed to floor / laid in trench obtained from item No. 34.00 to 41.00 here-in-before all as directed.
Ditto all as pr item No.42.00 here-in-before but for 100 mm dia.
Ditto all as pr item No.42.00 here-in-before but for 150 mm dia.
Ditto all as pr item No.42.00 here-in-before but for 200 mm dia.
Ditto all as pr item No.42.00 here-in-before but for 250 mm dia.
Ditto all as pr item No.42.00 here-in-before but for 300 mm dia.
S&F 80 mm Bore Cast Iron pipes with Spigot and Socket ends, Centrifugally cast, class 'A' in any length fixed to floor / laid in trench all as directed. Make Electrosteel/Kejriwal
Ditto all as pr item No.48.00 here-in-before but for 100 mm dia.
Ditto all as pr item No.48.00 here-in-before but for 150 mm dia.
Ditto all as pr item No.48.00 here-in-before but for 200 mm dia.
Ditto all as pr item No.48.00 here-in-before but for 250 mm dia.
Ditto all as pr item No.48.00 here-in-before but for 300 mm dia.
M&L for run lead joints for 80 mm Bore CI pipe with spun yarn and complete testing all as specified and directed.
Ditto all as pr item No.54.00 here-in-before but for 100 mm Bore.
Ditto all as pr item No.54.00 here-in-before but for 150 mm Bore.
Ditto all as pr item No.54.00 here-in-before but for 200 mm Bore.
Ditto all as pr item No.54.00 here-in-before but for 250 mm Bore.
Ditto all as pr item No.54.00 here-in-before but for 300 mm Bore.
M&L for Tyton rubber joint of size upto 300 mm dia complete all as specified and directed.
S&F sluice valve cast iron 150 mm bore confirming to IS : 14846 both end flanged with S/S spindle with nut class PN - 1.0 ISI marked complete with hand wheel nuts, bolts, washers & rubber gusket etc including tanikg town old unserviceable from site all as directed. (Make - Upadhya / Venus / Hazra / Kirloskar)
Ditto all as pr item No.61.00 here-in-before but 200 mm bore
Ditto all as pr item No.61.00 here-in-before but 250 mm bore
S&F CI Reflex Valve (NRV) with by pass arrangement of size 250 mm dia flanged end for CI pipes all as directed by Engineer-in-Charge. Make - Upadhya / Venus / Hazra/Kirloskar
S&F bends (any type, radius and angel) tapers any type (straingh, bend, increasing, decreasing or double socket etc) tee pieces single brancehs 'Y' junction double branch, cross (all socket or socket and spigot) collars, caps and plugs for Upto 150 mm bore of pipes complete all as specified and directed.
Ditto all as pr item No.65.00 here-in-before but 200 mm to 300 mm bore
Taking sample of water from Jack well/Sump wells/Borewell/User end and getiing tested from PHED.Raw water test to be carried out by Directorate of PUBLIC HEALTH ENGINEERING OFFICE by collection of sample from source of water physical and chemical and BACTERIOLOGICAL ANALYSIS to be carried out in every months, report shall be submitted to Engr-in-Charge
Excavation in trenches not exceeding 1.50 m wide and 1.5 mtr depth for foundation etc, not exc 10 sqm on plan and getting out in soft/loose soil complete all as specified and directed.
Returning filling in including spreading, leveling watering well ramming in layers not exc 25cm thick complete all as specified and directed.
Removing excavated materials (soils) not exc. 50m and depositing where directed at a level not exc. 1.5m above the starting point complete all as specified and directed.
M&L for PCC 1:3:6 type C2 using 40 mm graded stone aggregate for making good the road/path etc. complete all as specified and directed.
Taking down GI pipes 15 mm dia from trenches/walls etc all as directed
Taking down GI pipes 20 mm dia from trenches/walls etc all as directed
Taking down GI pipes 25 mm dia from trenches/walls etc all as directed
Taking down GI pipes 40 mm dia from trenches/walls etc all as directed
Taking down GI pipes 50 mm dia from trenches/walls etc all as directed
M&L for 15 mm Bore steel water tubing medium grade galvanised with new fitting laid in trenches all as specified and directed.
Ditto all as pr item No.77.00 here-in-before but 20 mm Bore.
Ditto all as pr item No.77.00 here-in-before but 25 mm Bore.
Ditto all as pr item No.77.00 here-in-before but 40 mm Bore.
Ditto all as pr item No.77.00 here-in-before but 50 mm Bore.
Labour only for refixing 15 mm Bore steel water tubing medium grade galvanised with new fitting laid in trenches/wall obtained from item No. 72.00 to 76.00 here-in-before all as directed.
Ditto all as pr item No.77.00 here-in-before but 20 mm Bore.
Ditto all as pr item No.77.00 here-in-before but 25 mm Bore.
Ditto all as pr item No.77.00 here-in-before but 40 mm Bore.
Ditto all as pr item No.77.00 here-in-before but 50 mm Bore.
M&L for attending pipe line break down of CI pipe of 80 mm dia by making lead joint with lead and spun yarn and moulding clay including taking up/down pipe using chain pulley or rope and excavation in any type of soil,returning filling and removel of soil all as specified and testing of pipe line complete all as directed.
Ditto all as pr item No.87.00 here-in-before but CI pipe of dia 100 mm
Ditto all as pr item No.87.00 here-in-before but CI pipe of dia 150 mm
Ditto all as pr item No.87.00 here-in-before but CI pipe of dia 200 mm
(Note : The Scope of Work contained in 'Sch of Credit' amounting to Rs.1,50,400.00 (refer Tender Srl Page No 40). The Quoted sum shall be arrived at after deducting the amount of “Sch of Credit” from the total amount of the ‘BoQ’
Prahalad Rai
M/S CONTRACTS
CHAKRABORTY AND SONS
BEEPEE AND COMPANY
M/S G D CONSTRUCTION
M/S BENGAL ENGINEERING ENTERPRISES
M/S KAR CONSTRUCTION
M/S R. K. INDUSTRIES
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .